SMM Morning Comments (Mar 2): Shanghai base metals fell across the board following strong gains overnight for shares on Wall Street

Published: Mar 02, 2021 10:00 (GMT+8)
Shanghai base metals declined across the board on Tuesday morning. Meanwhile, their counterparts on the LME rose for the most part.

SHANGHAI, Mar 2 (SMM) — Shanghai base metals declined across the board on Tuesday morning. Meanwhile, their counterparts on the LME rose for the most part.

Shanghai base metals fell across the board in overnight trading. Copper fell 1.27%, aluminium declined 0.91%, zinc shed 0.54%, tin weakened 3.55%, lead slid 0.16% and nickel edged down 0.65%.

The LME complex mostly advanced on Tuesday. Copper added 0.34%, zinc rose 0.41%, lead went up 0.19% and nickel strengthened 0.35%, while aluminium slid 1.67% and tin fell 5.9%.

Copper: Three-month LME copper rose 0.34% to end at $9031/mt on Monday, and is likely to trade between $9,000-9,100/mt today.

The most-active SHFE 2104 copper contract went down 1.13% to close at 66,690 yuan/mt in overnight trading, and it is expected to move between 66,300-66,900 yuan/mt today, while spot copper will be traded between discounts of 60-50 yuan/mt.

It was announced at night that US ISM manufacturing index in February had the fastest growth in three years, and the positive data boosted the US index to return to above 91, and copper contracts continued to fall under pressure. In addition, in terms of crude oil, US oil plunged more than 2% yesterday, refreshing the low of nearly one week to $59.96/barrel, which was also good for copper contracts. It is estimated that copper contracts have limited callback space. On the spot side, at the beginning of March, the transaction under long-term contracts started, and the market activity will return to the trading heat. Traders are more interested in buying in the discount state. However, with the continuous repair of the contracts, the downstream market entry will further increase, and it is expected that the discount rate will continue to rise steadily in the near term.

Aluminium: Three-month LME aluminium fell 1.67% to close at $2,121/mt on Monday, with open interest falling to 705,000 lots. It is expected to trade between $2,000-2,180/mt today.

The most-liquid SHFE 2014 aluminium contract fell 0.53% to settle at 16,930 yuan/mt on Monday night, and is likely to trade between 16,600-17,100 yuan/mt today. Yesterday, the spot trading improved, and the downstream restocking efforts increased slightly. It is expected that the intraday premium will be flat or slightly narrowed compared with the previous day. Spot premiums for the contract will be seen higher at 50-30 yuan/mt.

Zinc: Three-month LME zinc rose 0.41% to close at $2,792/mt on Monday. Zinc stocks at LME-listed warehouses fell 50 mt to 269,725 mt. The US 1.9 trillion stimulus bill passed the House of Representatives overnight, which will be reviewed by the Senate this week. The implementation of the US economic stimulus plan will be monitored in the near term. The contract is likely to trade between $2,750-2,800/mt today.

The most-liquid SHFE 2104 zinc contract fell 0.61% to end at 21,210 yuan/mt in overnight trading. At present, the spot market transactions are still relatively tepid, and the rising stocks restrained the price increase of SHFE zinc. The "two sessions" in China are just around the corner, and the Politburo meeting once again set a proactive fiscal policy and a prudent monetary policy, focusing on maintaining stable economic operation. The setting of major economic goals of the two sessions this year and the 14th Five-Year Plan will be monitored. The SHFE zinc contract is expected to move between 21,000-21,500 yuan/mt today, while spot premiums for domestic 0# Shuangyan will be seen higher at 50-60 yuan/mt.

Lead: Three-month LME lead settled 0.19% higher at $2,067/mt on Monday. The support from 40-day moving average will be monitored today.

The most-active SHFE 2104 lead contract went down 0.16% to close at 15,370 yuan/mt on Monday night. Since March, battery enterprises have gradually resumed work to restock, and the recovery of downstream consumption is worth looking forward to. Whether the contract could continue its nighttime trend and stand firm at 20-day moving average will be monitored today.

Tin: Three-month LME tin closed down 6.54% at $23,595/mt on Monday. LME tin plunged more than 10% overnight, because it triggered technical selling after hitting a nine-year high last week, prompting investors to lock in profits, but supply shortage limited the decline. The tight supply and strong demand for electronic products have promoted the growth of Asian manufacturing industry, pushed up tin prices, and caused the spot prices to rise sharply compared with futures. The US dollar index once refreshed the high point since February 8 to 91.13. The market expects that as the US government prepares to offer new fiscal stimulus measures and vaccination becomes more common, economic growth and inflation will accelerate. In the past few trading days, the US dollar rose, following the upward trend of US bond yield. The benchmark 10-year US bond yield rose to 1.432% on Monday, but remained below the one-year high of 1.614% hit last Thursday. There is a need for adjustment after the continuous rise of LME tin, Pressure above will be seen from $26,000 /mt today. Support below will be seen from $23,000/mt today.

The most-liquid SHFE 2104 tin contract fell 2.81% at 177,190 yuan/mt on Monday night. The guidance of LME tin on the trend of SHFE tin will be monitored in the near term. Pressure above will be seen from 184,500 yuan/mt today. Support below will be seen from 166,500 yuan/mt today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)