SMM Morning Comments (Feb 25): Shanghai base metals rose across the board as Powell kept dovish course

Published: Feb 25, 2021 09:48
Shanghai base metals all cruised higher on Thursday morning, holding onto overnight gains, while their counterparts on the LME were mostly higher, as the Federal Reserve’s Powell reiterated on Wednesday that US interest rates will remain low and the Fed will keep buying bonds to support the US economy.

SHANGHAI, Feb 25 (SMM) — Shanghai base metals all cruised higher on Thursday morning, holding onto overnight gains, while their counterparts on the LME were mostly higher, as the Federal Reserve’s Powell reiterated on Wednesday that US interest rates will remain low and the Fed will keep buying bonds to support the US economy. 

Shanghai base metals all closed higher in overnight trading. Copper rose 1.49%, aluminium surged 3.03%, zinc added 0.16%, nickel jumped 2.19%, lead advanced 0.86% and tin soared 3.34%.

The LME complex performed similarly on Wednesday. Copper rose 2.68%, aluminium increased 2.27%, zinc and lead added 0.61%, nickel jumped 2.48% and tin gained 1.51%. 

Copper: Three-month LME copper rose 2.68% to close at $9,497.5/mt on Wednesday, after hitting a new high of $9,522.5/mt earlier in the session, The most-traded SHFE 2014 copper contract advanced 1.49% to end at 68,700 yuan/mt in overnight trading.

The Federal Reserve’s Powell reiterated on Wednesday that U.S. interest rates will remain low and the Fed will keep buying bonds to support the U.S. economy. The Dow Jones Industrial Average jumped 425 points to close at a record high in a volatile session amid rising risk appetite.

LME copper is expected to trade between $9,450-9,530/mt today, and SHFE copper between 68,500-69,000 yuan/mt, while spot copper will be traded between discounts of 200-100 yuan/mt.

Aluminium: Three-month LME aluminium jumped 2.27% to settle at $2,203/mt on Wednesday, with open interest adding 2,677 lots to 700,000 lots. It is likely to fluctuate between $2,000-2,200/mt today.

The most-liquid SHFE 2104 aluminium contract surged 3.03% to close at 17,145 yuan/mt in overnight trading, with open interest rising 13,006 lots to 221,000 lots. It is expected to move between 17,000-17,300 yuan/mt today.

Zinc: Three-month LME zinc ended 0.61% higher at $2,868/mt on Wednesday, with open interest adding 2,315 lots to 240,000 lots. Zinc stocks across LME-listed warehouses dropped by 1,425 mt or 0.52% to 270,525 mt. Continuous declines in LME zinc stocks suggested improved overseas demand, which supported LME zinc. It is likely to move between $2,830-2,880/mt today.  

The most-traded SHFE 2104 zinc contract added 0.16% to settle at 21,485 yuan/mt in overnight trading, with open interest decreasing 1,878 lots to 75,256 lots. Domestic treatment charges for zinc concentrate have hovered at low levels recently, and are likely to dip in March, which will support zinc prices. 

The April zinc contract is likely to move between 21,300-21,800 yuan/mt today, while spot premiums for domestic 0# Shuangyan will be seen at 40-70 yuan/mt against the March contract.

Nickel: The most-active SHFE 2104 nickel contract closed 2.19% higher at 145,770 yuan/mt in overnight trading, with open interest increasing 1,808 lots to 156,000 lots.

Lead: Three-month LME lead gained 0.61% to end at $2,139/mt on Wednesday.  

The most-liquid SHFE 2104 lead contract increased 0.86% to settle at 15,840 yuan/mt in overnight trading. 

Tin: Three-month LME tin closed 1.51% higher at $26,915/mt on Wednesday. LME tin stocks expanded 155 mt to 1,665 mt. LME tin is expected to remain high, moving between $25,000-28,000/mt today, as global tin supply has yet to rise significantly.

The most-liquid SHFE 2104 tin contract jumped 3.34% to end at 195,190 yuan/mt in overnight trading, and is likely to trade between 180,000-200,000 yuan/mt today. Domestic tin ore supply remained tight, which will support tin prices.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
23 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
23 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10