Proportion of 5G phones in China's mobile phone shipments may exceed 85% in 2021

Published: Jan 18, 2021 17:00
In November 2020, domestic mobile phone shipments reached a small peak for the second half of the year. In 2020, 5G mobile phone shipments totalled 162.77 million units, accounting for 52.9% of the total domestic mobile phone shipments.

SHANGHAI, Jan 18 (SMM) – In November 2020, domestic mobile phone shipments reached a small peak for the second half of the year. In 2020, 5G mobile phone shipments totalled 162.77 million units, accounting for 52.9% of the total domestic mobile phone shipments.

In 2020, China's LCO output totalled 75,000 mt, a year-on-year increase of 22%. In 2020, LCO demand from China's lithium battery industry rose 16.9% year-on-year. This was mainly driven by increasing demand for office supplies and entertainment products at home amid COVID-19 and increased 5G mobile phone shipments.

On the other hand, output of tricobalt tetraoxide in China was 7,055 mt in December 2020, an increase of 1.4% month-on-month and 41.2% year-on-year. Downstream stockpiling ahead of Chinese New Year (CNY) drove tricobalt tetraoxide producers to increase production in December. However, some producers reduced operating rates in January due to shortage of raw materials. Tricobalt tetraoxide production is estimated at 7,000 mt in January, a decrease of 1.4% from the previous month and an increase of 65.2% from the same period last year.

5G mobile phones likely to account for nearly 70% of China's total mobile phone shipments in Jan

For more information on the China New Energy sector, please subscribe to China Cobalt & Lithium Weekly Report.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
14 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
14 hours ago