SMM Morning Comments (Dec 22): Shanghai base metals weakened across the board on new Covid strain

Published: Dec 22, 2020 10:00 (GMT+8)
Shanghai base metals all cruised lower on Tuesday morning as a new coronavirus variant in the UK sparked worries on economic recovery, and their counterparts on the LME set for a mixed start as US Congress prepares to vote on a stimulus deal.

SHANGHAI, Dec 22 (SMM) — Shanghai base metals all cruised lower on Tuesday morning as a new coronavirus variant in the UK sparked worries on economic recovery, and their counterparts on the LME set for a mixed start as US Congress prepares to vote on a stimulus deal.

Shanghai base metals fell across the board in overnight trading. Copper shed 1.42%, aluminium fell 1.89%, zinc weakened 0.86%, lead slumped 2.43%, nickel pulled back 2% and tin lost 1.41%. 

The LME complex performed similarly on Monday. Copper slid 1.51%, aluminium weakened 1.39%, zinc shed 0.35%, lead tumbeld 3.84%, nickel retreated 0.74% and tin slipped 0.6%. 

Copper: Three-month LME copper ended 1.51% lower at $7,875/mt on Monday. The most-traded SHFE 2102 copper contract shed 1.42% to close at 58,410 yuan/mt in overnight trading, with open interest decreasing 6,383 lots to 119,000 lots.

A rebound in the US dollar index overnight weighed on copper futures. Congressional leaders in Washington moved toward the passage of a $900 billion economic relief package. An agreement was reached on Sunday night, but the text of the final deal was not released until Monday afternoon. A vote is expected on Monday night. But the new Covid mutation in the UK has resulted in lockdown in most parts of the country and prompted several European countries to cut off transport with the UK, and this sparked worries about the economic recovery.

LME copper is expected to trade between $7,850-7,930/mt today, and SHFE copper between 58,300-58,800 yuan/mt, while spot copper will be traded between discounts of 200 yuan/mt and 120 yuan/mt.

Zinc: Three-month LME zinc touched $2,900/mt in European trading hours, its highest in 2020, but later slumped to an intraday low of $2,786/mt as the US dollar strengthened. The contract closed 0.35% weaker at $2,848/mt on Monday, with open interest rising 1,312 lots to 233,000 lots. Zinc stocks across LME-listed warehouses dropped by 1,625 mt or 0.77% to 208,325 mt. The dollar gained against most currencies on Monday, as a fast-spreading new coronavirus strain prevalent in Britain prompted investors to seek safety in the greenback, and this pressured LME zinc. But Congressional leaders in Washington moved towards the passage of a $900 billion economic relief package and positive progress in vaccines lent some support to zinc prices. LME zinc is expected to fluctuate between $2,820-2,870/mt today.

The most-traded SHFE 2102 zinc contract fell 0.86% to settle at 21,805 yuan/mt in overnight trading, with open interest adding 697 lots to 98,149 lots. The more transmissible new coronavirus strain in the UK boosted risk-off sentiment. Treatment charges (TCs) for domestic zinc concentrate dipped slightly, but its supply remained tight, which provided support to zinc prices. The February contract is likely to move between 21,500-22,000 yuan/mt today, while spot premiums for domestic 0# Shuangyan will be seen lower at 80-100 yuan/mt against the January contract.

Nickel: The most-active SHFE 2102 nickel contract slumped 2% to close at 128,420 yuan/mt in overnight trading, after earlier hitting a more than one-week low at 127,170 yuan/mt, with open interest decreasing 12,000 lots to 124,000 lots.

Lead: Three-month LME lead tumbled 3.84% to close at $1,952/mt on Monday, posting a four-day losing streak. Several countries blocked their borders to the UK due to the new virus variant in the country. Worries over the new virus strain overshadowed the progress in US economic stimulus talks.

The most-liquid SHFE 2102 lead contract plunged 2.43% to end at 14,445 yuan/mt in overnight trading.

Tin: Three-month LME tin declined 0.6% to close at $19,960/mt on Monday. The dollar index hit a 10-day high earlier in the Monday session. Analysts said volatile moves are typical of this time of year when volumes are thin. LME tin stocks extended declines to 2,940 mt. Tight tin supply overseas will underpin tin prices in the near term. LME tin is expected to trade between $19,600-20,300/mt today. 

The most-traded SHFE 2102 tin contract fell 1.41% to settle at 150,800 yuan/mt in overnight trading, after hitting a one-week low at 150,800 yuan/mt earlier in the session, with open interest decreasing 1,699 lots to 27,856 lots. Support below will be seen from the 150,000 mark today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)