SMM Evening Comments (Dec 21): Shanghai nonferrous metals ended mixed, aluminium fell 2.34%

Published: Dec 21, 2020 18:00 (GMT+8)
SHFE nonferrous metals closed mixed on Monday December 21 as the coronavirus situation in parts of North Asia remains serious.

SHANGHAI, Dec 21 (SMM) – SHFE nonferrous metals closed mixed on Monday December 21 as the coronavirus situation in parts of North Asia remains serious.

China on Monday kept its Loan Prime Rates unchanged, in line with expectations from analysts and traders in a recent poll. The one-year and five-year LPR were kept at 3.85% and 4.65%, respectively.

Nickel, the best performer, rose 1.72%, copper advanced 0.27% and zinc went up 1.42%, while aluminium edged down 2.34%, tin fell 1.65% and lead weakened 2.02%.

SMM data showed that social inventories of refined zinc ingots across Shanghai, Tianjin, Guangdong, Jiangsu, Zhejiang, Shandong and Hebei decreased 500 mt from last Friday December 18 to 154,000 mt as of Monday December 21. The stocks were down 9,100 mt from last Monday December 14.

The ferrous complex rose across the board. Iron ore surged 9.68%, rebar rose 4.99%, and hot-rolled coil climbed 4.98%.

Copper: The most-traded SHFE 2102 copper contract closed up 0.27% at 59,280 yuan/mt. Open interest rose 7,976 lots to 126,000 lots.

New strains of COVID-19 appeared in England, and the comprehensive blockade in London and other regions to curb the runaway new strains led to the suspension of British flights in many European countries. The market is once again pessimistic about the COVID-19 outbreak. However, the news of the stimulus is positive, and McConnell, the majority leader of the US Senate, said that he had reached an agreement with the Democratic leaders on the nearly $900 billion anti-pandemic relief plan. In addition, Trump signed the expediency spending bill last Friday to keep the federal government running. The continuous monetary easing policy keeps investors in the capital market confident in the near term.

The Central Economic Work Conference, which closed on Friday in China, set the tone for next year, requiring a prudent monetary policy to be flexible, precise, reasonable and moderate, and a proactive fiscal policy to improve quality, efficiency and sustainability. Macroeconomic policies should maintain the necessary support for economic recovery, and do not make sharp turns. It can be seen that under the tone of domestic stable monetary policy next year, the economy will recover in an orderly manner.

Euro zone consumer confidence for December, the specific landing of the US stimulus bill and whether long positions could move above 60,000 yuan/mt will come under scrutiny tonight.

Aluminium: The most-liquid SHFE 2101 aluminium contract finished the day 2.34% lower at 16,280 yuan/mt. Open interest fell 16,275 lots to 97,601 lots.

Zinc: The most-active SHFE 2102 zinc contract rose to an intraday high of 22,315 yuan/mt in afternoon trading and finished the day 1.42 higher at 22,180 yuan/mt. Open interest rose 18,998 lots to 97,500 lots.The US stimulus bill reached a consensus over weekend, but its stimulus scale was smaller than the market expectation. The British pandemic has mutated and continued to ferment, and the pandemic prevention measures in European are likely to be tightened again, which is likely to lead to a decrease in the overseas consumption again. The contract is likely to keep fluctuating at high.

Nickel: The most-traded SHFE 2102 nickel contract ended the day 1.72% higher at 132,740 yuan/mt today. Open interest fell 12,681 lots to 135,403 lots.

Lead: The most-traded SHFE 2101 lead contract fell to a session low of 14,435 yuan/mt and ended the day 2.02% higher at 14,525 yuan/mt. Open interest rose 1,251 lots to 29,607 lots. There is a certain support at 14,400 yuan/mt, and there is little room for SHFE lead to continue to fall due to the shrinkage of secondary lead premium. However, it is in the off-season of consumption at the end of the year, and the oversupply gives upward pressure to lead prices. It is expected that the contract will mainly consolidate at low with support from 14,400 yuan/mt tonight.

Tin: The most-liquid SHFE 2102 tin contract climbed to a session high of 155,940 yuan/mt and finished the day 1.65% lower at 152,090 yuan/mt today. Open interest fell 3,823 lots to 29,555 lots. The contract is expected to keep fluctuating in the near term. Pressure above is expected to around 156,000 yuan/mt. Support below is expected to around 151,500 yuan/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
1 hour ago
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Read More
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Selkirk Copper Mines has reported additional high-grade drill results from its ongoing Phase 2 programme at the Minto copper-gold-silver project in Yukon, Canada, including one of the highest-grade intersections recorded at the property.​ Step-out drilling at Minto North returned 9.27% copper, 7.43 g/t gold and 54.9 g/t silver, equivalent to 15.11% copper-equivalent, over 5.4 metres in drill hole 26SCM209. The same hole also intersected a separate 9.0-metre interval grading 0.97% copper, 2.58 g/t gold and 8.4 g/t silver, equivalent to 3.11% CuEq.​ Selkirk said the 5.4-metre interval ranks within the 99th percentile of more than 4,300 significant historical drill intercepts at Minto. Individual one-metre samples within the interval returned peak grades of up to 17.5% copper, 15.9 g/t gold and 81.9 g/t silver.​ The company also reported additional mineralisation from Area 118, Minto Main and Copper Keel. At Area 118, infill drilling intersected 2.54% copper, 1.25 g/t gold and 10.7 g/t silver over 3 metres, while another hole returned 1.61% copper, 0.59 g/t gold and 8.3 g/t silver over 6.9 metres.​ Selkirk's Phase 2 programme had originally targeted 50,000 metres of drilling. As of September 28, the company had completed 52,485 metres in 224 drill holes, equivalent to 105% of the planned meterage. Drilling is expected to continue until mid-October, with the remaining work focused on geotechnical data collection, water-monitoring wells and exploration of newly identified geophysical targets.​ The latest Minto North results further demonstrate the presence of high-grade copper-gold-silver mineralisation within areas relevant to Selkirk's planned restart strategy. The 5.4-metre interval is particularly notable because it ranks among the highest-grade intersections historically drilled at Minto. However, these are exploration results rather than additions to the current Mineral Resource Estimate. Attention will therefore remain on how the Phase 2 drilling is incorporated into future resource modelling and feasibility-level mine planning for the proposed restart of the Minto operation.
1 hour ago
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
1 hour ago
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
Read More
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
Panama Commission to Recommend Cobre Panama Restart Through State Partnership
A Panamanian government commission is expected to recommend restarting the suspended Cobre Panama copper mine through a state partnership with First Quantum Minerals, according to Reuters, citing two sources familiar with the matter.​ The commission is set to formally submit its recommendation to President José Raúl Mulino, who will make the final decision on whether and how the mine could restart. The proposed structure would involve a joint venture between the Panamanian state and First Quantum, although a final agreement with the miner would still need to be negotiated.​ Cobre Panama has remained suspended since 2023 after widespread public opposition over environmental and governance concerns, followed by a Supreme Court ruling that declared the mine's operating contract unconstitutional.​ The operation had accounted for around 1% of global copper production before it was idled and was previously First Quantum Minerals' largest revenue-generating asset, contributing around 40% of the company's revenue.​ According to foreign media reports, the Panamanian government has been weighing the economic importance of the mine against continuing public concerns over environmental oversight and the distribution of economic benefits. A government study published earlier in September estimated that the mine's closure had resulted in the loss of more than 30,000 jobs and reduced taxes and royalties to the state by nearly US$1.4 billion.​ Foreign media previously reported that Panama was considering a model under which the mine's underlying concession would remain with the state while First Quantum retained operational control. A 60–65% stake for First Quantum had also been discussed, although it remains unclear whether those terms are part of the current proposal.​ A formal recommendation to restart Cobre Panama would represent a significant step toward potentially returning one of the world's largest copper mines to production. However, the restart remains uncertain because President Mulino has not yet made a final decision, a joint-venture agreement with First Quantum has not been reached, and the legal structure of any new operating arrangement would still need to address Panama's current restrictions on new mining concessions. Given Cobre Panama's previous contribution of around 1% of global copper supply, any credible pathway toward a restart will remain closely watched by the copper market.
1 hour ago
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
3 hours ago
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
Read More
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
Amazon Invests $1.59B in Taiwan AI Server PCB Maker GCE, Secures Strategic Stake Amid Expansion
Taiwan AI server PCB maker Gold Circuit Electronics announced on September 29 that Amazon will join a private placement as a strategic investor, subscribing 1,856,308 new shares at NT$856 per share, or about NT$1.59 billion, with the shares locked up for three years. The subscription price equals 80 percent of the NT$1,070 reference price. GCE already supplies main boards for AWS Trainium AI servers, and Trainium 3 is expected to enter mass production in the third quarter of 2026, with AWS-related shipments ramping from that quarter. The same day, the board approved NT$7.9 billion for a new plant, comprising about NT$3.8 billion for land and NT$4.1 billion for buildings and equipment, to be deployed from the fourth quarter of 2026 and funded by unsecured convertible bonds. GCE is expanding in Taiwan, Suzhou, Changshu and Thailand, has raised its 2026 capital expenditure to NT$19 billion, and says high-end AI board capacity still cannot fully meet customer demand; the cloud provider's equity stake should help secure new plant capacity ahead of demand.
3 hours ago