Steel News Roundup

Published: Dec 21, 2020 13:37
According to China Iron and Steel Association, the national standard of raw materials for secondary steel has been released recently and will be officially implemented on January 1 2021.

SHANGHAI, Dec 21 (SMM) — This is a roundup of news in the steel industry for last week.

China's national standard of raw materials for secondary steel will be implemented in 2021

According to China Iron and Steel Association, the national standard of raw materials for secondary steel has been released recently and will be officially implemented on January 1 2021. This standard will maximise the exploitation of international and domestic raw material resources for secondary steel, so as to increase the recycling rate of iron resources, provide more effective options for steel enterprises, and curb the price increase and the consumption of iron ores to a certain extent.

Nanjing Iron and Steel Group plans to invest over $380 million to establish a steel plant in Indonesia

Nanjing Iron and Steel Group plans to invest $383.5 million to build its first steel plant in Indonesia with an annual production capacity of 2.6 million mt. This plant will include 4 furnace smelting facilities, which will take 18 months to complete construction. In order to speed up the construction of the factory, Nanjing Iron and Steel is working with Tsingshan Group in establishing a joint venture in which Nanjing Iron and Steel holds 78% of stake and Tsingshan holding 21%.

Xinjiang Bayi Iron and Steel broke global traditional blast furnace oxygen-enrichment limit

The blast oxygen content of oxygen blast furnace at Baosteel Xinjiang Bayi Iron and Steel (Bayi) has reached 35% in the first stage of industrial experiment, breaking the global traditional blast furnace oxygen enrichment limit.

On July 15, 2020, China's first oxygen blast furnace was put into operation Bayi, marking that China's low-carbon metallurgical process has entered the stage of industrialization testing. This oxygen blast furnace is rebuilt from the original 430 cubic meters traditional blast furnace of Bayi The industrial test of the oxygen blast furnace is divided into two stages. In the second stage, carbon dioxide removal technology will be introduced, which will take 3 to 4 months to open up the gas circulation process and achieve 50% ultra-high oxygen enrichment.

After the goal of the second phase is achieved, Bayi Iron and Steel will move towards achieving the full-oxygen enrichment smelting goal and actively promote hydrogen-enriched smelting.

High-speed railways to be built from Xiong’an New Area to Shangqiu, construction of the Hainan Free Trade Port to commence

China's National Development and Reform Commission (NDRC) has approved the proposal to build new high-speed railways from Xiong’an New Area to Shangqiu. The total investment in the construction is 82.71 billion yuan.  On the other hand, China is also pushing forward theconstruction of the Hainan Free Trade Port. Recently, 2020's fifth batch of 75 major project contracts were signed in Hainan. At the same time, the implementation of zero tariff system in Hainan Free Trade Port is  also speeding up. Following the release of the zero-tariff list of raw and auxiliary materials, three zero-tariff lists of self-produced equipment for enterprises, operation transportation, and consumer goods for residents will also be issued.

Spot supply of thermal coal “extremely tightacross domestic mines

Although the thermal coal futures prices have fallen by 100 yuan/mt from high, spot supply is still extremely tight in mines and ports. A coal trader said inventories at mines are currently at “very low levels” and the producers are unable to give valid quotations amid the volatility of coal prices. Hence, transaction prices are settled only on arrivals.

For more information on the iron ore and steel sectors, please subscribe to our China Iron Ore Weekly and China Steel Briefing.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
Jun 5, 2026 11:08
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
Read More
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
Supply Gap Persists in Vietnamese Market, Spot Lead Traded at High Premiums
[Ex-China Lead Market Dynamics] It was learned that the recent environmental protection inspections on secondary lead in the Vietnamese market had temporarily come to an end, and some lead smelters had gradually resumed production. However, in the face of the current primary lead supply gap, spot lead in the local market continued to maintain high premiums. According to the latest information, the CIF premium for Vietnamese lead ingots with Pb≥99.99% in June had reached $180/mt as a common transaction price, compared to around $165/mt in May.
Jun 5, 2026 11:08
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
May 27, 2026 14:15
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
Read More
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Collection Enterprise Updates] Recently, the Xinye Branch of the Nanyang Municipal Ecology and Environment Bureau in Henan Province officially approved the Environmental Impact Assessment Report for the waste lead-acid battery collection, storage, and transfer project of Nanyang Zhongjie Environmental Protection Technology Co., Ltd. (Wan Xin Huan Shen [2026] No. 8). The project will construct a comprehensive workshop integrating weighing, loading and unloading, and storage, with designated areas for intact batteries, dedicated storage rooms for damaged batteries, and temporary hazardous waste storage rooms, with a designed annual collection and transfer capacity of 5,000 mt of waste lead-acid batteries.
May 27, 2026 14:15
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
May 19, 2026 17:28
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Read More
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
[Secondary Lead Enterprise Updates] It was reported that the 200,000 mt lead-acid battery environmental protection utilization project of Dongying Xinsanyuan Environmental Protection Technology Co., Ltd. was under orderly construction and progressing on schedule, and was expected to be completed and put into operation before the end of 2026. As a key project in Dongying City, Shandong Province, the project had a total investment of 480 million yuan, covering an area of 103 mu. Once completed, it will fill the regional gap in the harmless treatment and resource utilization of waste lead-acid batteries, injecting new momentum into regional green circular development.
May 19, 2026 17:28