Steel News Roundup

Published: Dec 21, 2020 13:37 (GMT+8)
According to China Iron and Steel Association, the national standard of raw materials for secondary steel has been released recently and will be officially implemented on January 1 2021.

SHANGHAI, Dec 21 (SMM) — This is a roundup of news in the steel industry for last week.

China's national standard of raw materials for secondary steel will be implemented in 2021

According to China Iron and Steel Association, the national standard of raw materials for secondary steel has been released recently and will be officially implemented on January 1 2021. This standard will maximise the exploitation of international and domestic raw material resources for secondary steel, so as to increase the recycling rate of iron resources, provide more effective options for steel enterprises, and curb the price increase and the consumption of iron ores to a certain extent.

Nanjing Iron and Steel Group plans to invest over $380 million to establish a steel plant in Indonesia

Nanjing Iron and Steel Group plans to invest $383.5 million to build its first steel plant in Indonesia with an annual production capacity of 2.6 million mt. This plant will include 4 furnace smelting facilities, which will take 18 months to complete construction. In order to speed up the construction of the factory, Nanjing Iron and Steel is working with Tsingshan Group in establishing a joint venture in which Nanjing Iron and Steel holds 78% of stake and Tsingshan holding 21%.

Xinjiang Bayi Iron and Steel broke global traditional blast furnace oxygen-enrichment limit

The blast oxygen content of oxygen blast furnace at Baosteel Xinjiang Bayi Iron and Steel (Bayi) has reached 35% in the first stage of industrial experiment, breaking the global traditional blast furnace oxygen enrichment limit.

On July 15, 2020, China's first oxygen blast furnace was put into operation Bayi, marking that China's low-carbon metallurgical process has entered the stage of industrialization testing. This oxygen blast furnace is rebuilt from the original 430 cubic meters traditional blast furnace of Bayi The industrial test of the oxygen blast furnace is divided into two stages. In the second stage, carbon dioxide removal technology will be introduced, which will take 3 to 4 months to open up the gas circulation process and achieve 50% ultra-high oxygen enrichment.

After the goal of the second phase is achieved, Bayi Iron and Steel will move towards achieving the full-oxygen enrichment smelting goal and actively promote hydrogen-enriched smelting.

High-speed railways to be built from Xiong’an New Area to Shangqiu, construction of the Hainan Free Trade Port to commence

China's National Development and Reform Commission (NDRC) has approved the proposal to build new high-speed railways from Xiong’an New Area to Shangqiu. The total investment in the construction is 82.71 billion yuan.  On the other hand, China is also pushing forward theconstruction of the Hainan Free Trade Port. Recently, 2020's fifth batch of 75 major project contracts were signed in Hainan. At the same time, the implementation of zero tariff system in Hainan Free Trade Port is  also speeding up. Following the release of the zero-tariff list of raw and auxiliary materials, three zero-tariff lists of self-produced equipment for enterprises, operation transportation, and consumer goods for residents will also be issued.

Spot supply of thermal coal “extremely tight” across domestic mines

Although the thermal coal futures prices have fallen by 100 yuan/mt from high, spot supply is still extremely tight in mines and ports. A coal trader said inventories at mines are currently at “very low levels” and the producers are unable to give valid quotations amid the volatility of coal prices. Hence, transaction prices are settled only on arrivals.

For more information on the iron ore and steel sectors, please subscribe to our China Iron Ore Weekly and China Steel Briefing.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Peru sees 1 million t/y copper output boost within five to six years
Sep 26, 2026 01:38 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Read More
Peru sees 1 million t/y copper output boost within five to six years
Peru sees 1 million t/y copper output boost within five to six years
Peru's Energy and Mines Minister Guillermo Shinno said the country expects to add about 1 million tonnes of annual copper production within five to six years through new mining projects. The world's third-largest copper producer anticipates 2026 output of 2.5 to 2.7 million tonnes, roughly unchanged from 2023 as declining ore grades and recurring social conflicts weigh on supply. The newly elected government is seeking to reverse that stagnation by cutting red tape; in the two months since taking office, mining companies have stepped up engagement with the ministry. Shinno said officials have identified 27 permits that could be eliminated from roughly 100 mining-sector requirements, without lowering environmenta
Sep 26, 2026 01:38 (GMT+8)
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
Sep 25, 2026 13:25 (GMT+8)
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
Read More
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
BHP-Amazon copper EAC pilot draws mining-sector interest in lower-carbon labelling
Spanish-language mining media report that BHP and Amazon have rolled out the first lower-emissions copper pilot at Escondida using Environmental Attribute Certificates, certifying emissions reductions within the mining setting rather than offsetting them elsewhere. Unveiled on 22 September 2026, the pilot leverages Escondida's renewable electricity and desalinated water, with Amazon retiring the certificates to match lower-carbon attributes to its AI infrastructure. Escondida produces about 1.2 million tonnes of copper annually as the world's largest mine, and the label is expected to serve growing demand for low-carbon metal procurement.
Sep 25, 2026 13:25 (GMT+8)
Western Mining Subsidiary Receives 17-Year License for Qinghai Polymetallic Mine
Sep 22, 2026 16:11 (GMT+8)
Western Mining Subsidiary Receives 17-Year License for Qinghai Polymetallic Mine
Read More
Western Mining Subsidiary Receives 17-Year License for Qinghai Polymetallic Mine
Western Mining Subsidiary Receives 17-Year License for Qinghai Polymetallic Mine
On September 22, Western Mining announced that its wholly owned subsidiary, Qinghai Ganxin Mining Development Co., Ltd. (“Ganxin Mining”), recently obtained a Mining License issued by the Department of Natural Resources of Qinghai Province. The mine, named the Geermu Tuwenchahan Iron Polymetallic Mine of Qinghai Ganxin Mining Development Co., Ltd., covers iron, copper, gold, molybdenum, zinc, lead, and silver as the permitted mining commodities. The mining license is valid from August 3, 2026, to August 30, 2043.
Sep 22, 2026 16:11 (GMT+8)