China Mineral Resources: at present, the company's LiF production capacity is 3000 tons / year, lithium carbonate production capacity is 6000 tons / year.

Published: Dec 17, 2020 17:06

SMM12, March 17: prior to this, China Mineral Resources said that battery-grade LiF was sold to Morita Chemical in Japan, becoming a member of Tesla's supply chain system, and providing lithium fluoride products for leading domestic enterprises such as Yan'an Bikang, Tianji shares, Shanshan shares, Taurus Power and other domestic lithium hexafluorophosphate and electrolyte enterprises.

Recently, China Mineral Resources said that the company currently has an annual production capacity of 3000 tons of LiF and 6000 tons of lithium carbonate, and is actively building a new production line with an annual production capacity of 15000 tons of battery-grade lithium hydroxide and 10, 000 tons of battery-grade lithium carbonate. The company's lithium salt business has a good market reputation, and the main customer of battery-grade LiF is Morita Chemical of Japan, thus entering Tesla's global supply chain system.

Revenue in the first three quarters of 2020 was about 823 million yuan, down 3.50 percent from the same period last year; net profit was about 101 million yuan, down 20.47 percent from the same period last year; and basic earnings per share was 0.3617 yuan, down 23.88 percent from the same period last year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
17 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
17 hours ago