SMM Morning Comments (Dec 15): LME nonferrous metals fell across the board amid increasing concerns of new lockdown measures

Published: Dec 15, 2020 10:00
Shanghai base metals set for a mixed start on Tuesday morning, while their counterparts on the LME fell across the board as investors worried that the continuous spread of Covid-19 may prompt national countries to impose stricter lockdown measures.

SHANGHAI, Dec 15 (SMM) — Shanghai base metals set for a mixed start on Tuesday morning, while their counterparts on the LME fell across the board as investors worried that the continuous spread of Covid-19 may prompt national countries to impose stricter lockdown measures. 

Shanghai base metals closed mixed in overnight trading. Copper shed 0.35%, zinc weakened 0.14% and lead slid 0.5%, while aluminium added 0.18%, nickel rose 0.63% and tin increased 1.74%.

The LME complex, except for lead, ended higher on Monday. Copper added 0.12%, aluminium advanced 0.76%, zinc firmed 1.87%, nickel gained 1.76% and tin rose 0.49%, while lead underperformed with a 1.31% loss. 

Copper: Three-month LME copper added 0.12% to close at $7,778/mt on Monday, whereas the most-traded SHFE 2101 copper contract shed 0.35% to end at 57,500 yuan/mt in overnight trading.

The Electoral College voted Monday to cement President-elect Joe Biden’s victory over President Donald Trump in this year’s presidential election. The first round of shots from the vaccine developed by Pfizer and BioNTech were given in the U.S. on Monday, but the country also passed 300,000 deaths from Covid-19, according to data from Johns Hopkins University. New York City Mayor Bill de Blasio also warned residents that a full shutdown may be needed to protect the city’s hospitals. Besides, the US dollar index rebounded from lows overnight, which limited upward space for copper futures.

LME copper is expected to trade between $7,730-7,810/mt today, and SHFE copper between 57,400-57,900 yuan/mt while spot copper is likely to be traded between discounts of 10 yuan/mt and premiums of 70 yuan/mt.

Zinc: Three-month LME zinc settled 1.87% higher at $2,836.5/mt on Monday, with open interest rising 4,679 lots to 241,000 lots. Zinc stocks across LME-listed warehouses plunged by 1,300 mt or 0.61% to 213,575 mt. The rollout of Pfizer vaccine and Biden’s winning of presidential election lifted market sentiment, while the continuous spread of Covid-19 exerted negative impact on global economic recovery, which put some pressure on zinc prices. LME zinc is expected to fluctuate between $2,790-2,840/mt today.

The most-liquid SHFE 2101 zinc contract pulled back 0.14% to close at 21,425 yuan/mt in overnight trading, with open interest decreasing 2,052 lots to 77,989 lots. Currently, treatment charges for both domestic and seaborne zinc concentrate remained at low levels, lowering profits at zinc smelters and driving them to reduce production. Relative tight zinc supply was still supportive to zinc prices. The January contract is likely to move between 21,000-21,500 yuan/mt today, while spot premiums for domestic 0# Shuangyan will be seen stable at 90-110 yuan/mt against the contract.

Nickel: The most-active SHFE 2102 nickel contract advanced 0.63% to end at 131,050 yuan/mt in overnight trading, with open interest increasing 4,307 lots to 179,000 lots.

Lead: Three-month LME lead shed 1.31% to settle at $2,030/mt on Monday, posting a four-day losing streak. Lead stocks across LME-listed warehouses surged by about 10,000 mt.

The most-liquid SHFE 2101 lead contract weakened 0.5% to end at 14,790 yuan/mt in overnight trading. Zinc inventories in China have increased for nine straight weeks, which pressured SHFE lead.

Tin: Three-month LME tin ended 0.49% firmer at $19,625/mt on Monday, after recording a new high in 2020 at $19,765/mt earlier in the session. On Monday, the US dollar index at one point fell to 90.419, its lowest since April 2018. European countries imposed stricter restrictions and the New York City may enter a full lockdown to curb the spread of Covid-19, which boosted risk-off sentiment. LME tin is expected to fluctuate between $19,200-20,000/mt today.

The most-liquid SHFE 2102 tin contract rose 1.74% to settle at 153,540 yuan/mt in overnight trading, with open interest rising 1,931 lots to 33,558 lots. The February tin contract is likely to move between 149,400-155,000 yuan/mt today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
21 hours ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
21 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Sep 12, 2026 01:13
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
Sep 12, 2026 01:13
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Sep 12, 2026 01:10
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
Sep 12, 2026 01:10