NEA and NDRC issue notice on signing mid- and long-term power contracts in 2021

Published: Dec 14, 2020 15:11 (GMT+8)
The National Development and Reform Commission (NDRC) and the National Energy Administration (NEA) recently jointly issued the "Notice on Doing a Good Job in the Signing of Medium and Long-term Power Contracts in 2021" (hereinafter referred to as the "Notice"), requiring government departments, power companies and trading organizations to organize and coordinate the signing of medium and long-term power contracts (including priority power generation) within and across provinces and regions.

SHANGHAI, Dec 14 (SMM) — The National Development and Reform Commission (NDRC) and the National Energy Administration (NEA) recently jointly issued the "Notice on Doing a Good Job in the Signing of Medium and Long-term Power Contracts in 2021" (hereinafter referred to as the "Notice"), requiring government departments, power companies and trading organizations to organize and coordinate the signing of medium and long-term power contracts (including priority power generation) within and across provinces and regions.

The notice puts forward 10 priorities:

  1. Strive to complete the annual medium- and long-term contract signing work by the end of December this year
  2. Ensure sufficient contract signing
  3. Promote time-based contract signing
  4. Widen the spread between the peak-to-valley prices
  5. Encourage the signing of multi-year power medium and long-term contracts
  6. Enable credit information sharing
  7. Standardize medium and long-term contracts for electricity
  8. Encourage the signing of medium and long-term electronic contracts for electricity
  9. Establish a sound support mechanism for medium and long-term power contracts
  10. Ensure the implementation of medium and long-term contracts for electricity

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Two Suspensions in Two Months: Sigma Lithium Permits Suspended Again, Expansion Affected
31 mins ago
[SMM Analysis] Two Suspensions in Two Months: Sigma Lithium Permits Suspended Again, Expansion Affected
Read More
[SMM Analysis] Two Suspensions in Two Months: Sigma Lithium Permits Suspended Again, Expansion Affected
[SMM Analysis] Two Suspensions in Two Months: Sigma Lithium Permits Suspended Again, Expansion Affected
31 mins ago
[Lake Resources’ Kachi Project Receives Environmental Approval]
41 mins ago
[Lake Resources’ Kachi Project Receives Environmental Approval]
Read More
[Lake Resources’ Kachi Project Receives Environmental Approval]
[Lake Resources’ Kachi Project Receives Environmental Approval]
On September 29, Lake Resources announced that its Kachi lithium brine project in Argentina has received an Environmental Impact Declaration (DIA) issued by the Mining Ministry of Catamarca Province. The DIA requires a 200-meter surface exclusion zone around the lagoon shoreline. The company said it is updating mineral resource estimates accordingly, but existing ore reserve estimates and wellfield development plans are not expected to be affected. The project uses Lilac Solutions’ direct lithium extraction (DLE) technology and is designed to reinject more than 95% of processed brine into the native aquifer, isolated from freshwater resources, and to eliminate traditional evaporation ponds. Kachi Phase 1 has a designed capacity of 25,000 tonnes per annum of lithium carbonate equivalent (LCE), and the company’s planned Phase 2 scheme aims to further increase capacity to 50,000 tpa. Following environmental approval, the project is entering the front-end engineering and design (FEED) stage, advancing engineering definition, long-lead equipment procurement, construction planning, and commercial negotiations, in preparation for a subsequent final investment decision (FID). The company also committed US$1 million to the Catamarca Province Mining Concession Trust Fund to support local community infrastructure.
41 mins ago
[China Union Holdings: Canada’s FIRES to Further Review Lithium Brine Investment]
1 hour ago
[China Union Holdings: Canada’s FIRES to Further Review Lithium Brine Investment]
Read More
[China Union Holdings: Canada’s FIRES to Further Review Lithium Brine Investment]
[China Union Holdings: Canada’s FIRES to Further Review Lithium Brine Investment]
On September 29, China Union Holdings announced that, as previously announced on August 14, it had received a notice from Canada’s foreign investment review and economic security authority (“FIRES”), which considered that the company’s investment in the Arizaro lithium brine project could affect Canada’s national security and might therefore initiate a further review within 45 days from the date of the notice. On September 29, the company received a notice from FIRES under Section 25.3 of the Investment Canada Act, notifying it of FIRES’s intention to conduct a further review of the transaction. The company and the seller are continuing to communicate with FIRES and are considering feasible options or remedies.
1 hour ago