China HRC output to extend gains in December on firm demand from end-users

Published: Dec 10, 2020 14:15 (GMT+8)
An SMM survey showed that 35 steel makers in China plan to produce a total of 10.41 million mt of hot-rolled coils and plates in December, up 1.4% from the realised output in November.

SHANGHAI, Dec 9 (SMM) — An SMM survey showed that 35 steel makers in China plan to produce a total of 10.41 million mt of hot-rolled coils and plates in December, up 1.4% from the realised output in November.

China's monthly output of hot-rolled coils and plates (planned production)

In the past two months, Chinese manufacturers received robust orders, especially orders from overseas buyers, which boosted demand for hot-rolled coils and plates. Therefore, steel makers have kept their output for domestic sales at high levels in recent months.

In December, overseas HRC prices have increased as manufacturing activities have recovered gradually, but supply of raw materials has lagged behind, and this prompted domestic steel makers to significantly raise output for export.

The output of hot-rolled coils and plates for domestic sales will shrink 1%, or 97,500 mt from the month before to 9.81 million mt in December, while that for export will surge 76.3%, or 261,000 mt to 603,000 mt. HRC output rose slightly in most regions in December, but dipped in a few regions due to maintenance of blast furnace and rolling lines.

Planned output of hot-rolled coils and plates by region

North China: Planned output of hot-rolled coils and plates=5.49 million mt, -84,500 mt/1.52%; exports=301,000 mt, +181,000 mt/150.83%

East China: Planned output of hot-rolled coils and plates=2.78 million mt, +138,000 mt/5.23%; exports=302,000 mt, +80,000 mt/36.04%

South Central China: Planned output of hot-rolled coils and plates=1.81 million mt, +50,000 mt/2.84%; No exports

West China: Planned output of hot-rolled coils and plates=343,000 mt, +60,000 mt/21.2%; No exports

Decent profits drove some steel mills which had switched to produce rebar in November returned to produce HRC in December, which contributed to the increase in planned HRC output this month.

Slightly higher planned HRC output should have posed greater supply pressure, but as SMM learned, most of the steel makers have raised output proportion of cold-rolled coil feedstock, and thus output for domestic sales was limited. In addition, steel mills increased exports and reduced domestic sales, which, in fact, eased domestic supply pressure. Meanwhile, end-user demand remained strong as sales and output at HRC downstream users such as automobiles and home appliances were robust.

However, weakening demand for some terminal products such as pipes and machinery and investors’ reluctance to accept higher prices are likely to deter HRC prices from rising further.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Korea Zinc's $7.4B US Project Passes Environmental Assessment, Set for 2029 Trial Operations
19 hours ago
Korea Zinc's $7.4B US Project Passes Environmental Assessment, Set for 2029 Trial Operations
Read More
Korea Zinc's $7.4B US Project Passes Environmental Assessment, Set for 2029 Trial Operations
Korea Zinc's $7.4B US Project Passes Environmental Assessment, Set for 2029 Trial Operations
On September 21, Korea Zinc announced that its $7.4 billion US manufacturing project had passed the environmental impact assessment. The facility is scheduled to begin trial operations in 2029 and commercial production the following year, producing 11 critical minerals, 12 non-ferrous metals and semiconductor-grade sulfuric acid. In April, Korea Zinc said it had completed the acquisition of a local zinc smelter and other related companies. The company plans to implement the project by expanding and upgrading the existing facilities.
19 hours ago
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Sep 11, 2026 18:30 (GMT+8)
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Read More
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
Sep 11, 2026 18:30 (GMT+8)
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Sep 07, 2026 15:43 (GMT+8)
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Read More
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
The 300,000 mt/year copper cathode expansion project of JCC Hongyuan Copper, a subsidiary of Jiangxi Copper Corporation, entered the pre-approval public notice stage of its environmental impact assessment on September 4, with a total investment of approximately 1.416 billion yuan. The project is planned to start construction in September 2026 and be completed in December 2027. Upon completion, JCC Hongyuan's total capacity will jump from 250,000 mt to 550,000 mt.
Sep 07, 2026 15:43 (GMT+8)