SMM Morning Comments (Dec 3): Shanghai base metals fell across the board as longs left with profits

Published: Dec 3, 2020 09:52
Nonferrous metals on the SHFE all moved lower on Thursday morning as longs left the market with profits, while their counterparts on the LME set for mixed start.

SHANGHAI, Dec 3 (SMM) — Nonferrous metals on the SHFE all moved lower on Thursday morning as longs left the market with profits, while their counterparts on the LME set for mixed start.

Shanghai base metals fell across the board in overnight trading. Copper slid 0.44%, aluminium declined 1.16%, zinc fell 1.55%, lead weakened 1.25%, nickel slipped 0.99% and tin edged down 0.19%.

The LME complex, except for aluminium, cruised lower on Wednesday. Copper weakened 0.32%, zinc slid 0.88%, lead dropped 0.82%, nickel declined 1.57% and tin edged down 0.11% while aluminium inched up 0.12%.

Copper: Three-month LME copper ended 0.32% lower at $7,675/mt on Wednesday, and is expected to trade between $7,630-7,710/mt today.

The most-active SHFE 2101 copper contract closed 0.44% weaker at 57,120 yuan/mt in overnight trading, with open interest decreasing 3,621 lots to 133,000 lots.

Data released by the ADP National Employment Report overnight showed US private payrolls rose by 307,000 jobs in November, lower than economists’ forecast for a 410,000 rise in new jobs. It was also the smallest monthly increase since May. On Capitol Hill, House Speaker Nancy Pelosi and Senate Minority Leader Chuck Schumer issued a joint statement calling on Republicans to work with them on another round of Covid relief funding, using a bipartisan proposal from Senate moderates as a starting point. Optimistic market sentiment limited the downward room for copper futures prices.

Zinc: Three-month LME zinc settled 0.88% lower at $2,749.5/mt on Wednesday after hitting a more than one-week low of $2,772/mt earlier in the session. Zinc stocks across LME-listed warehouses shrank 225 mt or 0.1% to 220,275 mt. US private payrolls in November fell short of expectations, suggesting that non-farm employment data set for release on Friday may likely to decline. But expectations of a US stimulus bill and positive Covid vaccine news limited the decline in zinc prices. LME zinc is likely to trade between $2,730-2,780/mt today.

The most-traded SHFE 2101 zinc contract declined 1.55% to close at 20,930 yuan/mt in overnight trading, with open interest falling 5,312 lots to 88,781 lots. It is expected to move between 20,700-21,200 yuan/mt today, while spot premiums for domestic 0# Shuangyan will be seen at 130-140 yuan/mt against the January contract.

Nickel: The most-active SHFE 2102 nickel contract fell to a more than one-week low of 117,480 yuan/mt after the bell of the overnight trading, but later recouped some losses to end 0.99% lower at 118,810 yuan/mt, with open interest falling 1,226 lots to 150,000 lots.

Lead: Three-month LME lead climbed to touch an intraday high of $2,073/mt in the European trading hours on Wednesday before falling sharply to an intraday low of $2,027.5/mt. The contract settled 0.82% weaker at $2,052/mt.

The most-liquid SHFE 2101 lead contract slumped to a nearly two-week low of 14,820 yuan/mt in overnight trading before reversing some losses to close 1.25% weaker at 14,955 yuan/mt, generating a V-shaped movement. Positive domestic macroeconomic environment and firm secondary lead costs limited the drop in lead prices.

Tin: Three-month LME tin ended 0.11% lower at $18,805/mt on Wednesday, and is expected to trade between $18,500-19,000/mt today.

The most-liquid SHFE 2102 tin contract fell rapidly to a one-month low of 145,200 yuan/mt after the bell of the overnight trading, before wiping out some losses to close 0.19% lower at 146,060 yuan/mt. Support below will be seen from around 145,000 yuan/mt today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
1 hour ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 on September 12, the core smelting furnace of the pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd.'s multi-metal recovery project was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation, and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode to be built in two phases, with capacity of 300,000 mt/year in each phase. Phase I is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, along with supporting systems for smelting, converting, anode refining, electrolysis, slag beneficiation, and precious metal recovery. After this ignition, the project will carry out standardized furnace drying and hot-state integrated trial runs across the entire system to verify equipment, instruments, interlocks, and automatic control systems. The project has not yet formally started raw material feeding and production; after furnace drying and system commissioning are completed, it will further advance the commissioning of Phase I's 300,000 mt/year copper cathode capacity. If the project is successfully brought into production, it is expected to increase copper smelting capacity in North China and further boost domestic demand for copper concentrate raw materials.
1 hour ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
17 hours ago
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Read More
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources Starts Drilling Copper-Gold Targets at Yellow Mountain
Alchemy Resources announced on September 11 that reverse-circulation drilling has commenced across its Yellow Mountain and Overflow projects in New South Wales, Australia, with up to 15 holes planned during the latest exploration campaign.​ At the 80%-owned Yellow Mountain project, drilling will test extensions to previously identified copper-gold and polymetallic mineralisation, as well as two previously undrilled geophysical targets.​ Previous drilling at Yellow Mountain returned an intersection of 113 metres grading 1.17% copper equivalent, comprising 0.33% copper, 0.37 g/t gold, 24.3 g/t silver, 0.86% lead and 1.23% zinc. The latest drilling campaign is designed to test whether the known mineralised system extends into newly identified target areas.​ The program will also include drilling at the Overflow project, where Alchemy is targeting extensions to existing mineralisation along strike and at depth. Overflow currently hosts an inferred mineral resource of approximately 342,000 ounces of gold equivalent and contains gold, silver, copper, lead and zinc mineralisation.​ The commencement of drilling provides a near-term test of the scale and continuity of mineralisation at Yellow Mountain. The previously reported broad copper-gold-polymetallic intersection indicates potential for a sizeable mineralised system, while the newly defined geophysical targets provide additional exploration upside. Drilling results will be important in determining whether the mineralised footprint can be materially expanded.
17 hours ago
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
17 hours ago
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Read More
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport CEO Signals Likely Go-Ahead for $4.5 Billion Bagdad Copper Expansion
Freeport-McMoRan Chief Executive Officer Kathleen Quirk has indicated that the company expects to move forward with the proposed expansion of its Bagdad copper mine in Arizona, marking a stronger commitment to the project ahead of a formal investment decision. Speaking at the Jefferies Global Industrials Conference on September 10, Quirk said the project still requires input from Freeport's board but that she expects the company will proceed. She described the expansion as a roughly three-year construction project and noted that no major permitting hurdles are expected. Freeport's latest project estimates put capital expenditure for the Bagdad expansion at approximately US$4.5 billion, around 30% above the previous US$3.5 billion estimate, reflecting cost escalation, scope changes and additional engineering. The project would more than double concentrator capacity at Bagdad and is expected to add approximately 200–250 million lb, or around 91,000–113,000 tonnes, of copper production annually, alongside an additional 10–12 million lb of molybdenum. Bagdad currently has a reserve life exceeding 80 years. Freeport's Q2 2026 regulatory filing had described the project as being prepared for a potential investment decision during the second half of 2026. The latest comments therefore represent a more positive signal from management on the likelihood of development, although formal board approval has not yet been announced. A decision to proceed with Bagdad would represent one of Freeport's most significant near-term copper growth investments in the US. The potential addition of more than 90,000 tonnes per year of copper would materially increase Freeport's US output, although first production would remain several years away given the expected construction period. Attention will now turn to formal board approval and a final investment decision.
17 hours ago
SMM Morning Comments (Dec 3): Shanghai base metals fell across the board as longs left with profits - Shanghai Metals Market (SMM)