Tesla's annual output is still expected to reach 500000 vehicles this year, and the capacity utilization rate is about 72%.

SMM: according to an internal email, Tesla CEO Elon Musk told employees that the company is still expected to produce 500000 cars this year. According to investor data updated by Tesla in the second quarter, Tesla currently has a production capacity of 690000 vehicles, so the annual production of 500000 vehicles means that its capacity utilization is 72 per cent. Tesla shares rose 3.6 per cent to $428.86 on the news.

产量,特斯拉,特斯拉年产量,特斯拉产能利用率

Tesla's annual production capacity (Photo Source:: FT))

Tesla said in January that the company would easily deliver more than 500000 new cars in 2020. Despite the novel coronavirus outbreak, the company has not changed this forecast. "it will depend on the delivery results in the fourth quarter," Musk said in an email to employees. Please take whatever measures you can think of to increase the output (and improve the quality at the same time). "

This kind of email is very common in Tesla. Musk sends emails to employees every quarter, encouraging them to hint at production targets and potential new records.

Last week, Tesla announced that the company delivered a total of 139300 cars in the third quarter, an all-time high. However, the company's share price fell as some analysts questioned Tesla's ability to meet his ambitious annual targets. In order to meet the target of 500000 vehicles, Tesla will have to deliver 182000 vehicles in the fourth quarter.

At present, Tesla's delivery efforts are supported by the Shanghai Super Factory. In December, Tesla began delivering Model 3 models made at the Shanghai factory and said he planned to produce 150000 Model 3 cars at the plant this year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
13 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
13 hours ago