Hyundai: 44 electrified models will be launched by 2025

Published: Oct 2, 2020 18:31

SMM: a few days ago, Hyundai Group announced plans to launch 44 electrified models by 2025, including hybrid (including plug-in hybrid), electric vehicles and hydrogen fuel cell vehicles, during the Beijing Auto Show.

Specifically, these 44 new models will include 23 pure electric models, 2 hydrogen fuel cell vehicles, 13 ordinary hybrids and 6 plug-in hybrids. Supported by these products, Hyundai plans to sell 1 million electrified models by 2025, accounting for 10 per cent of its total sales.

In order to accelerate the electrification transformation and complete the 2025 product strategy, Hyundai Group also established a new electric vehicle brand in August this year-the IONIQ,IONIQ brand will complete the launch of three models in the next four years, namely IONIQ 5, IONIQ 6 and IONIQ 7. This means that the 2025 strategy formulated by Hyundai Group will be the next joint direction of Hyundai, Kia, Genisse and IONIQ.

Editor's comments:

Judging from the product strategy revealed by Hyundai Group, the South Korean car company is indeed trying to promote the "elephant turn". As pure electric is the current mainstream technology route, Hyundai also announced that it will become one of the world's third-largest electric vehicle manufacturers by 2025, reaching its sales target of 560000 pure electric vehicles without fuel cells. At present, Hyundai Automobile has started its first step. according to reports, the Hyundai Prophecy concept car unveiled at this year's Beijing Auto Show represents Hyundai's prospect of the electric future, which also means that the modern electric era of brand-new aesthetic and brand-new design is coming.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 hour ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
1 hour ago
Hyundai: 44 electrified models will be launched by 2025 - Shanghai Metals Market (SMM)