Jiangxi Xinchang Industrial Manufacturing Co., Ltd. was unveiled at the 9th International Cable and Wire Exhibition in Wire China 2020.

Published: Sep 25, 2020 13:19 (GMT+8)

SMM9 March 25: this week, Jiangxi Xinchang Industrial Manufacturing Co., Ltd. with the company's latest output unveiled at the Wire China 2020 9th International Cable and Wire Exhibition (booth number W2C41), during which a large number of new and old customers visited and stopped, many domestic and foreign customers expressed strong interest in the company's products.

Dongguan Xinmei and Jiangxi Xinchang Co., Ltd. was founded in October 1997, specializing in the development and production of various diamond eye models. Excellent quality, reasonable price and fast after-sales service have been recognized and supported by all kinds of wire drawing manufacturers over the years.

At present, the company is one of the largest wire drawing die manufacturers in the country, with more than 5000 tons of modern 5S management factory, meeting the ISO9001:2008 quality management system standards. Raw diamond eye models from Φ 0.012mm to Φ 15mm, with a monthly output of more than 20000. Widely used in the world's leading wire drawing equipment: horizontal multi-head wire drawing machine (minimum specification 0.05-16), double-head large drawing machine, high-speed wire drawing enamelled machine and all kinds of single-end wire drawing machine. With the industry's leading sleeve technology, German laser drilling equipment, Norwegian Conoptica wire drawing die testing system-CU11S equipment, products and quality are at the highest level in the mold industry. The company has a professional mold repair room to provide customers with a variety of mold reaming and polishing services. The products sell well in all provinces and cities all over the country and are exported to all parts of the world, including European and American markets!

At the end of 2018, Jiangxi Xinchang Industrial Manufacturing Co., Ltd. welcomed Jiayin, recognized as a high-tech enterprise by the Jiangxi provincial government, and formally entered the ranks of high-tech enterprises. This indicates that Xinchang mould has been recognized by government departments in terms of technical strength and innovation ability, and has joined the ranks of national high-tech enterprises, creating conditions for setting foot in a broader market in the future.

Jiangxi Xinchang Industrial Manufacturing Co., Ltd. has been established for more than 20 years, has always maintained good development, focusing on the development and innovation of diamond eye models, and constantly making progress. Jiangxi Xinchang Industrial Manufacturing Co., Ltd. will continue to apply new technology and develop new products to provide more customers with high-quality products and satisfactory services.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)