SMM Network News: recently, Yunnan Energy Supervision Office officially issued the "Yunnan FM Auxiliary Service Market Operation rules (trial)", energy storage power stations and wind power, photovoltaic and other power plants can jointly participate, FM mileage declared price upper and lower limit of 8 yuan / MW, 3 yuan / MW, Yunnan FM market started simulation operation since October 2020.
Yunnan FM Auxiliary Service Market Operation rules (trial) are applicable to provincial-level and above directly dispatched grid-connected power plants, wind farms above 30MW, centralized photovoltaic power stations above 10kV, etc., and third-party auxiliary service providers, such as energy storage devices and energy storage power stations, which can provide FM services, can join with the above-mentioned power plants to participate as the main body of the market. The document requires that the comprehensive FM performance index of the participants is not less than 0.3.

![The Most-Traded SHFE Tin Contract Opened Lower and Then Traded Stronger, Spot Market Recovers Amid Downtrend [SMM Tin Midday Review]](https://imgqn.smm.cn/usercenter/WWXJU20251217171753.jpg)
![The most-traded SHFE tin contract fluctuated rangebound during the night session, with downstream enterprises mostly following up with small-lot transactions. [SMM Tin Morning Brief]](https://imgqn.smm.cn/usercenter/bYFQn20251217171752.jpg)
