Lithium carbonate prices are expected to rise slightly in the near term

Published: Sep 17, 2020 11:35
The overall prices of battery-grade lithium carbonate have shown a downward trend since the beginning of the year, according to an SMM survey.

SHANGHAI, Sep 17 (SMM) — The overall prices of battery-grade lithium carbonate have shown a downward trend since the beginning of the year, according to an SMM survey.

 

The daily average price of battery-grade lithium carbonate stood at 40,000 yuan/mt as of September 15, and fell 10,250 yuan/mt from the highest level of 50,250 yuan/mt since the beginning of the year. SMM believed that the supply and demand structure of lithium carbonate has improved, mainly because the import of Argentina and Chile dropped sharply. The pandemic situation in the two countries is still severe at present. The single-day confirmed cases reached a single-day high on September 10, and the import is expected to remain low in August.

 

Most domestic lithium salt manufacturers are in full production, and lithium carbonate is in short supply, according to an SMM survey. The shipments of lithium salt manufacturers were tight, and most of the quotations increased. However, the increasing speed of demand side is not as fast as the releasing speed of production capacity. Therefore, it is expected that prices of lithium carbonate may rise slightly and stabilise in the long run.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
12 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
12 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
12 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
12 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
12 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
12 hours ago