Jingye Group formally acquired Guangdong Taidu Iron and Steel Co., Ltd.

Published: Sep 14, 2020 08:02
Source: Hebei News Network

SMM: on Sept. 11, Jingye Group formally acquired and took over Guangdong Taidu Iron and Steel Industry Co., Ltd., and the two sides held a handover ceremony in Jieyang City, Guangdong Province. This is another important measure taken by Jingye Group in the strategic layout of the iron and steel industry after the acquisition of British Iron and Steel and Yunnan Yongchang Iron and Steel this year.

Guangdong Taidu Iron and Steel Industry Co., Ltd. is a private iron and steel enterprise in Jieyang City, with sintering, blast furnace, converter, steel rolling production line, power generation, oxygen production and other supporting facilities, convenient land and surface transportation, self-built two 5000-ton professional iron and steel wharves with an annual throughput of more than 2 million tons.

After the completion of the acquisition, Jingye Group will give full play to its own advantages, implement capital and industrial integration to Guangdong Taidu Iron and Steel Industry Co., Ltd., promote technological innovation and product structure optimization, and further promote enterprise transformation and upgrading.

Industry insiders believe that this acquisition provides a solid foundation for Jingye Group to gain a foothold in Guangdong and radiate South China, and to enter the market of "dedicated blue" rebar and other products in eastern Guangdong and Dawan area.

"Click to understand and sign up: 2020 China Automotive New Materials Application Summit Forum

Scan the QR code above to view the business cards of the participating companies and sign up online

Scan the code and apply to join the SMM Automotive Industry Exchange Group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
11 hours ago
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Read More
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
According to an announcement by NFC, on April 2, 2026, Zhongse Indonesia Dari Mining Co., Ltd., a holding subsidiary of China Nonferrous Metal Industry's Foreign Engineering and Construction Co., Ltd., obtained the "Environmental Feasibility Decision (SKKL) on Mining Activities of Lead-Zinc Ore by Dari Mining in SilimaPungga-Pungga Township, Dari County, North Sumatra Province" issued by the Ministry of Environment of the Republic of Indonesia. According to NFC's disclosure, the mine is an underground mine with a designed capacity of 1 million mt/year. As of 2024, the total resources/reserves of the Dari lead-zinc mine were: ore volume of 20.7009 million mt, zinc metal content of 2.2562 million mt, lead metal content of 1.3203 million mt, with an average zinc grade of 10.90% and an average
11 hours ago
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Apr 7, 2026 14:07
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Read More
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Shuangli Mining Launches Upgraded Iron Mine, Aiming for 870,000 MT Annual Iron Ore Output
Recently, Inner Mongolia Shuangli Mining Co., Ltd. (hereinafter referred to as "Shuangli Mining") held the completion and trial production ceremony for the upgrading and capacity expansion project of the mining and beneficiation system at the No. 2 Iron Mine in the Geqi mining area.Once the project reaches full production, it will produce 870,000 mt of iron ore concentrates, 9,580 mt of copper concentrates, 5,432 mt of lead concentrates, and 2,052 mt of zinc concentrates annually, injecting new momentum into Shuangli Mining's green and high-quality development.
Apr 7, 2026 14:07
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Mar 24, 2026 17:21
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
Read More
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
East China Special Steel's Ferromolybdenum Tender Price Fell, Procuring 120 mt
[Molybdenum-Iron Tender Information] SMM, March 24: It is reported that on March 23, a special steel group in east China announced the tender price for a new round of ferromolybdenum procurement, with the tax-inclusive plant-delivered acceptance-settled price at 277,500 yuan/mt, down 2,000 yuan/mt from the tender price on March 18. The public tender purchase volume was 120 mt (bid volume), while the actual total purchase volume remained to be determined.
Mar 24, 2026 17:21
Jingye Group formally acquired Guangdong Taidu Iron and Steel Co., Ltd. - Shanghai Metals Market (SMM)