Ningde era signed a strategic cooperation agreement with Changan Automobile

Published: Sep 10, 2020 10:05

SMM News: recently, Ningde Times and Changan Automobile signed a strategic cooperation agreement in Ningde. According to the agreement, the two sides will establish a long-term and in-depth partnership in the fields of intelligent network-connected electric vehicles and smart energy ecology, to jointly promote the construction and development of China's new energy vehicle industry ecology.

Prior to this cooperation, Changan Automobile invested in Ningde era in 2017 by acquiring the share of Zhenjiang Demao Hairun Equity Investment Fund Partnership (Limited Partnership). Not long before this acquisition plan, Changan Automobile officially released its brand-new new energy strategy, the "Shangri-La Plan", announcing that Changan Automobile would stop selling traditional fuel vehicles in 2025, while spending 100 billion yuan to develop new energy vehicles. Ningde era investment is also among them.

Therefore, whether it is the previous shareholding or today's cooperation, Ningde era is one of the important chains in Changan automobile new energy planning. According to the latest financial report of Ningde Times, in the first half of this year, the effective catalogue of new energy models announced by the Ministry of Industry and Information Technology has a total of more than 3900 models, of which more than 2000 models are equipped with power batteries, accounting for about 51%. It is the power battery manufacturer with the largest number of matching models.

"Click to understand and sign up: 2020 China Automotive New Materials Application Summit Forum

Scan the QR code above to view the business cards of the participating companies and sign up online

Scan the code and apply to join the SMM Automotive Industry Exchange Group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
11 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
11 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
11 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
11 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
11 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
11 hours ago