[9.4 Zhishui Precious Metals Morning Review] the United States and non-farmers will wait and see before attacking precious metals and non-farmers tonight.

Published: Sep 4, 2020 09:03

SMM News: I. changes in macroeconomic policies:

1. On Tuesday, at 22:00 in New York, the US released closely watched ISM manufacturing PMI data for August, which beat expectations. Specific data show that the US ISM manufacturing PMI actually released 56 in August, with an expected value of 54.8 and a previous value of 54.2. ISM manufacturing PMI in the United States recorded 56 in August, the highest level since January 2019.

two。 Market performance:

Gold rose slightly in the previous session, with a high of $1951 / oz and a low of $1922 / oz to close at $1930 / oz.

three。 Position analysis:

Gold and silver CFTC non-commercial net long positions are in the middle and high level, and the risk of long positions is gradually accumulating.

Fourth, technical analysis:

5. Focus on Today

Six. direction suggestion:

Gold

Silver

For more information, please contact Zhishui at 18950138010.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Platinum futures drift higher; spot market trading moderate [SMM daily review]
48 mins ago
Platinum futures drift higher; spot market trading moderate [SMM daily review]
Read More
Platinum futures drift higher; spot market trading moderate [SMM daily review]
Platinum futures drift higher; spot market trading moderate [SMM daily review]
48 mins ago
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
1 hour ago
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
Read More
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
US August CPI Data Released; Silver Market Sees Strong Wait-and-See Sentiment as Futures Consolidate [SMM Daily Review]
1 hour ago
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Sep 12, 2026 16:51
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Read More
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
Yingkou Jianfa Shenghai Phase I 300,000 mt Copper Cathode Project Smelting Furnace Starts Production, Pyrometallurgy System Enters Furnace Drying Stage
At 9:58 am on 12 September, the core smelting furnace of the polymetallic recovery project's pyrometallurgy system at Yingkou Jianfa Shenghai Nonferrous Chemical Co., Ltd. was successfully ignited, officially entering the furnace drying stage and marking a key step toward full-line commissioning and production. Public information shows that the Yingkou Jianfa Shenghai polymetallic complex gold-silver ore comprehensive recovery technology upgrade, relocation and expansion project uses copper concentrates as its main raw material, with an overall planned capacity of 600,000 mt/year of copper cathode. It is being built in two phases, with capacity of 300,000 mt/year in each phase. Phase one is designed to produce 300,000 mt/year of copper cathode and 1.18 million mt/year of sulphuric acid, supported by smelting, converting, anode refining, electrolysis, slag beneficiation and precious metal recovery systems. Following the ignition, the project will carry out standardised furnace drying and hot-state integrated commissioning across the entire system, verifying equipment, instrumentation, interlocks and automatic control systems. The project has not yet formally started raw material feed and production. Once furnace drying and system commissioning are completed, it will move forward with bringing the phase-one 300,000 mt/year copper cathode capacity into production. If the project is successfully commissioned, it will increase copper smelting capacity in north-east China and further boost China's demand for copper concentrate raw materials.
Sep 12, 2026 16:51