The first stage mining and separation project of Pulang Copper Mine designed by Enfei in China has passed the completion and acceptance.

Published: Aug 26, 2020 10:29

SMM: August 16-17, Yunnan Diqing Nonferrous Metals Co., Ltd. designed by Yunnan Diqing Copper Mine Phase I Mining and Separation Project (hereinafter referred to as "Pulang Copper Mine Phase I Project") passed the completion and acceptance of China Copper Industry and Yunnan Copper Industry Organization.

Pulang Copper Mine is a very large porphyry copper deposit, with a total of 4.3 million tons of copper metal found. The orebody is thick and nearly vertical, and the ore reserves are large, so it is suitable for large-scale mining. The production capacity of the first stage mining and separation project of Pulang Copper Mine is 12.5 million tons / year. The first phase of the project adopts full underground mining and natural caving mining, and the project design includes mining, mineral processing, tailings and public auxiliary facilities, with a design service life of 25 years.

In 2005, with the best technical solution and advanced environmental protection design concept, China Enfei won the bid for the design project. In the design work, China Enfei has always adhered to the design concept of building Pulang Copper Mine into a "large-scale, modern and environment-friendly" domestic largest non-ferrous metal underground mine and the largest natural caving mine. adhere to the use of international and domestic mining advanced technology, technology and equipment.

At present, Pulang Copper Mine has been built into a natural caving mine with the largest production scale in China, and it is also the first underground non-ferrous metal mine with more than 10 million tons of underground non-ferrous metal mines. it has modern equipment such as automatic ore drawing, unmanned, long-distance belt transportation, underground cycle crushing and so on, including many advanced technologies and equipment in the world, such as mining, mineral processing, tailings and so on. After the completion of the project, the mine has truly realized safe, efficient and low-cost production, and has become a super-large copper mine with the most advanced mining technology and the highest level of equipment in China.

Scan the QR code and apply to join the SMM Metal Industry Exchange Group

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Jul 15)
6 hours ago
Data: SHFE, DCE market movement (Jul 15)
Read More
Data: SHFE, DCE market movement (Jul 15)
Data: SHFE, DCE market movement (Jul 15)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 15 Jul , 2026
6 hours ago
On the last trading day, the high backwardation structure persisted, and overall trading was sluggish [SMM Shanghai spot copper]
6 hours ago
On the last trading day, the high backwardation structure persisted, and overall trading was sluggish [SMM Shanghai spot copper]
Read More
On the last trading day, the high backwardation structure persisted, and overall trading was sluggish [SMM Shanghai spot copper]
On the last trading day, the high backwardation structure persisted, and overall trading was sluggish [SMM Shanghai spot copper]
[SMM Shanghai Spot Copper] Looking ahead to tomorrow, the open interest for the SHFE copper 2607 contract is currently less than 2,000 lots, and the 2607 contract maintains a high backwardation against the 2608 contract. After the contract rollover, the market will officially price around the 2608 contract. Supply side, social inventory has been continuously declining recently. Arrivals of domestic and imported materials at some warehouses have been low, and the tightness of available spot supply is unlikely to ease significantly in the short term. LME data shows that the ratio of cancelled warrants on the LME has been rising continuously; coupled with the opening of the import window, subsequent import supply growth is expected to see some improvement. According to SMM, some warrants have been cancelled from LME and shipped to the Chinese market, expected to arrive at the end of this month or early next month. Demand side, downstream buyers' acceptance of high premiums is limited, market transactions are light, and suppliers have been continuously lowering their offers to secure deals. Since SMM always quotes against the front-month contract, spot premiums have been rapidly recovering due to the backwardation structure. Overall, with the support of the backwardation structure and weakening downstream consumption, Shanghai spot copper premiums against the 2608 contract are expected to remain at a premium tomorrow.
6 hours ago
Copper Prices Retreat After Rapid Rise, and Copper Scrap Suppliers Sell on Rallies [SMM Secondary Copper Daily Review]
7 hours ago
Copper Prices Retreat After Rapid Rise, and Copper Scrap Suppliers Sell on Rallies [SMM Secondary Copper Daily Review]
Read More
Copper Prices Retreat After Rapid Rise, and Copper Scrap Suppliers Sell on Rallies [SMM Secondary Copper Daily Review]
Copper Prices Retreat After Rapid Rise, and Copper Scrap Suppliers Sell on Rallies [SMM Secondary Copper Daily Review]
7 hours ago