Western oil companies plan to sell energy assets for $4.5 billion to repay debt

Published: Jul 30, 2020 11:34

SMM7, March 30: Western oil company (Occidental Petroleum Corp.) is in talks to sell energy assets in Africa and the Middle East (worth $4.5 billion) to Indonesian state-owned company PT Pertamina, according to people familiar with the matter. The deal will help Western oil companies reduce their acquisition of Anadarko Petroleum Corp. last year The resulting debt.

Shares in western oil have tumbled more than 60 per cent this year as a result of the worst decline in the oil and gas industry in years, and the company has laid off staff and cut spending to cope with huge debt. The stock was up 2.6% before the market opened on Wednesday.

The Indonesian company has also expressed interest in acquiring some of Occidental's assets in Algeria and Oman, although those assets may not be included in the initial deal, people familiar with the matter said.

Pertamina has not yet finalised a deal, the details of the deal are still likely to change, and other bidders have expressed interest in Occidental assets.

A spokesman for the company had no immediate comment.

"SMM online Q & A" has come to the market, price, information if you have any questions, feel free to ask!

Scan the QR code and join the SMM metal communication group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
12 mins ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
12 mins ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
24 mins ago
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
24 mins ago
Platinum futures drift higher; spot market trading moderate [SMM daily review]
4 hours ago
Platinum futures drift higher; spot market trading moderate [SMM daily review]
Read More
Platinum futures drift higher; spot market trading moderate [SMM daily review]
Platinum futures drift higher; spot market trading moderate [SMM daily review]
4 hours ago
Western oil companies plan to sell energy assets for $4.5 billion to repay debt - Shanghai Metals Market (SMM)