[brief Review of SMM Copper Futures] the intra-day depth of gold and silver pullback today, the main force of Shanghai copper opened high and left low.

Published: Jul 28, 2020 16:14

SMM July 28th: today, the main force of Shanghai copper opened at 51700 yuan / ton in the morning. After the opening, the bulls entered the market to pull up the copper price above 52000 yuan / ton, to the day's highest point of 52250 yuan / ton, but the short sellers suppressed the market rapidly. After falling about 400 yuan / ton, the center of gravity stabilized at 51900 yuan / ton. At this time, more than flat copper prices fell again, closing at 51640 yuan / ton at midday. Copper prices opened in the afternoon to explore the intraday low of 51360 yuan / ton, near the end of the day, the center of gravity of copper in Shanghai slightly rose to 51570 yuan / ton, and finally closed at 51540 yuan / ton, down 150 yuan / ton, down 0.29%. Today, the main daily position of Shanghai Copper increased by 1788 to 115000, mainly for short positions, and trading volume increased by 15000 to 167000. 08 during the contract day, positions were reduced by 3314 to 66000, mainly by long positions, while trading volume decreased by 9000 to 40, 000. Against the backdrop of tense international relations, severe novel coronavirus epidemic and market expectations that the Federal Reserve will remain loose for a long time, the US dollar is under full pressure, with precious metals such as gold and silver soaring to record highs, and copper prices are also boosted, opening high and breaking the 52000 mark in the morning. There was a deep correction in gold and silver during the day, and copper prices fell under pressure. Fundamentally, although the strike at the Centinela copper mine in Antofagasta, Chile has been avoided, the tight supply pattern at the mine side has not changed the market, and copper prices are still supported. Today, Shanghai Copper Yang, KDJ opening convergence, but the top is still under pressure 5-day, 10-day moving average. Wait for the guidance of the outer disk at night to test whether Shanghai Copper can reach the 52000 mark again.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
India, Russia Eye Expanded Mining and Critical Minerals Partnership
7 hours ago
India, Russia Eye Expanded Mining and Critical Minerals Partnership
Read More
India, Russia Eye Expanded Mining and Critical Minerals Partnership
India, Russia Eye Expanded Mining and Critical Minerals Partnership
New Delhi, Moscow seek to expand cooperation from mineral exploration to advanced materials.
7 hours ago
Data: SHFE, DCE market movement (Sep 09)
10 hours ago
Data: SHFE, DCE market movement (Sep 09)
Read More
Data: SHFE, DCE market movement (Sep 09)
Data: SHFE, DCE market movement (Sep 09)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 09 Sep , 2026
10 hours ago
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
10 hours ago
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
Read More
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
Cobre Secures Third-Party Ore Supply to Add 300 t/month of Copper Cathode at Sierra Atacama
Cobre Limited announced on September 9 that its Sierra Atacama operation in Chile has signed ore-purchase agreements with two third-party copper oxide miners in the Antofagasta region, with deliveries expected to ramp up from Q4 2026. The agreements are expected to supply approximately 50,000–75,000 tonnes of oxide ore per month grading 1.0–1.5% total copper, adding around 300 tonnes per month of copper cathode production.​ The additional production will be processed through Sierra Atacama’s existing SX-EW plant, which has installed copper cathode capacity of approximately 20,000 tonnes per year and is currently operating below nameplate capacity. As the purchased ore does not require Cobre to incur its own mining and development costs, the company said incremental costs will primarily comprise the ore purchase price and variable processing costs, including acid, power and reagents. Higher throughput is also expected to spread the plant’s fixed costs over a larger production base.​ The approximately 300 tonnes per month of additional cathode will be incremental to Cobre’s previously announced production targets, which remain unchanged. The company is continuing to stabilise underground production while preparing to transition toward a larger open-pit operation from 2027. Cobre said negotiations with additional regional ore suppliers are also underway, potentially providing further feed for the under-utilised SX-EW facility.​ The agreements represent a near-term increase in copper cathode supply from Sierra Atacama without requiring additional mining development or new processing capacity. At the initial expected rate, the third-party feed could contribute approximately 3,600 tonnes of additional cathode on an annualised basis. More importantly, it should raise utilisation of the existing SX-EW plant ahead of Cobre’s planned transition to expanded open-pit production in 2027. Further ore-supply agreements would provide additional upside to plant utilisation and cathode output.
10 hours ago