[SMM afternoon Review] Guangdong Zinc: downstream high purchases are weaker and transactions are mostly contributed by traders.

Published: Jul 27, 2020 11:52 (GMT+8)
SMM7 March 27: Guangdong zinc mainstream trading at 18080-18180 yuan / ton, the price concentrated on the Shanghai zinc 2009 contract discount of 10 yuan / ton to flat, the Guangdong market discount of 80 yuan / ton compared with the previous trading day increased by 10 yuan / ton.

SMM7 March 27: Guangdong zinc mainstream trading at 18080-18180 yuan / ton, the price concentrated on the Shanghai zinc 2009 contract discount of 10 yuan / ton to flat, the Guangdong market discount of 80 yuan / ton compared with the previous trading day increased by 10 yuan / ton. In the first trading session, the holder initially shipped the goods at a relatively straight price, but the price was high and fluctuating, the downstream wait-and-see mood was strong, the market price was difficult, and the quotations of some consignors were loosened in the later period. Kirin, Mengzi, Huize, Tiefeng quoted a discount of 10 yuan / ton to flat for the September contract of Shanghai zinc. The second trading session, downstream only rigid demand procurement, individual holders hang order price is higher, can appropriately reduce the discount range of shipment, pressure spot up discount performance, transactions are mostly contributed by traders. Kirin, Mengzi, Huize, Tiefeng quoted for Shanghai zinc September contract water 10 yuan / ton to Pingshui. Kirin, Mengzi, Huize mainstream transactions at 18080-18180 yuan / ton.

Scan the QR code in the picture to sign up for the lead-zinc summit and fill in the personal information on the last page. The meeting staff will contact you later!

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
19 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
19 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
23 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
23 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
23 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
23 hours ago