[SMM afternoon Review] Shanghai Zinc: the increase in the number of goods received in the market is better than that of yesterday.

Published: Jul 24, 2020 12:34 (GMT+8)
SMM7 March 24: the mainstream transaction of zinc in Shanghai is 18190PUR 18250 yuan / ton, Shuangyan is 18200Mel 18260 yuan / ton, and the import transaction is 18180Mel 18240 yuan / ton. Shuangyan quoted a liter of water of 60mur70 yuan / ton in August. Shuangyan quoted a liter of water of 70ft yuan / ton in August, and an import quoted a liter of water in August at 50Rue 60 yuan / ton.

SMM7 March 24:

The mainstream transaction of zinc in Shanghai is 18190mur18250 yuan / ton, Shuangyan 18260 yuan / ton, and the import transaction is 18180Mel 18240 yuan / ton. Shuangyan quoted water at 60mur70 yuan / ton in August, Shuangyan quoted water at 70mur80 yuan / ton in August, and imported water at 50Mel 60 yuan / ton in August. The mainstream transaction was 18120MUR 18180 yuan / ton. Zinc futures fell high, the morning market is mainly to pick up goods, domestic water is still up about 60 yuan / ton, transactions gradually increased, some traders tried to raise the quotation to about 70 cents 80 yuan / ton, there is also some transaction feedback, downstream every fall on demand to buy, the market transaction is better than yesterday.

 

"Brand"

Transaction interval

2008

Double swallow

70Mutual 80

Qin Zinc and Yuguang

SMC

50 murals 60

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
10 hours ago
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
Read More
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
NewPhotonics and Tower Semiconductor announced high-volume shipments of laser-integrated optical engines for AI infrastructure. The 800G and 1.6T PICs use Tower’s PH18DA silicon-photonics platform with heterogeneously integrated InP components, enabling lasers, SOAs, modulators and photodetectors on one chip. Volume shipments of 6.4T NPO chipsets are planned for H1 2027. SMM believes this signals that AI optical-interconnect demand is translating into InP device demand, supporting high-purity indium consumption. However, shipment volumes and InP intensity were not disclosed, so the near-term indium uplift cannot yet be quantified.
10 hours ago
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
15 hours ago
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Read More
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Blue Moon Metals announced that it has signed a definitive agreement to acquire 100% of the Turner copper-gold VMS deposit in Oregon from Gold Coast Mining. Consideration comprises US$4.7 million in cash, 4,778,761 Blue Moon shares valued at about US$27 million based on the 20-day VWAP, and up to US$7 million in milestones tied to underground exploration/development permitting, mining permits and commercial production. Closing is expected in November 2026, subject to TSX Venture Exchange approval and customary conditions. Turner is a past-producing Cyprus-type VMS deposit containing copper, gold, zinc, silver and cobalt. Its 2010 historical estimate reported 2.447 million short tons of Indicated material grading 2.65% zinc and 2.084 million short tons of Inferred material grading 2.78% zinc. The company expects permitting for exploration drilling and underground development to take 12–18 months.
15 hours ago
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
Sep 24, 2026 17:22 (GMT+8)
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
Read More
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
[Poor end-use demand performance, zinc oxide operating rate edges down] From the perspective of end-use demand performance, in the rubber-grade zinc oxide sector, tire enterprise orders are generally weak, and purchases of zinc oxide remain just-in-time; orders in the desulfurization field perform poorly, with demand remaining sluggish...
Sep 24, 2026 17:22 (GMT+8)