MCC's Saindak copper smelter was shut down for nearly 10 months before resuming production.

Published: Jul 17, 2020 16:22

SMM7 March 17: the smelter of the, MCC Saindak project resumed production on July 9th. After about 10 months of shutdown, MCC's Saindak Project smelter has resumed work and produced its first batch of crude copper this week.

The Saindak copper smelter had stopped production since November 2019 due to the Xinguan epidemic and the factory's winter vacation.

The Saindak project manager says smelting is a core part of the project. The first batch of crude copper produced means that the Saindak project has restored complete mineral processing, mining and smelting processes while preventing and controlling epidemics.

(MCC Group) of China Metallurgical Group is the longest-running construction force in China's iron and steel industry, and is a pioneer and main force in this field.

Saindak Copper and Gold Mine in Pakistan is located near the town of Saindak in Balochistan. It is estimated that the ore reserves of the mine are 412 million tons.

Scan the QR code and join the SMM metal communication group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
7 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
7 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
8 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Read More
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
The Autonomous Bougainville Government said the Lloyds Panguna Metals & Energy Limited camp at the Panguna copper-gold mine was attacked on September 13. Personnel were assaulted and machinery was damaged in an arson attack. Authorities have not disclosed the extent of injuries or equipment losses. President Ishmael Toroama condemned the incident and said the government would continue pursuing the mine’s redevelopment.
8 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
8 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
Read More
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
According to Iranian media reports citing Seyed Mostafa Feiz, CEO of the National Iranian Copper Industries Company (NICICO), Iran’s geological copper ore resources rose to 24.5 billion tonnes from 22.2 billion tonnes at the start of the Iranian year, up 10.6%. Mineable (designable) reserves increased to 18.2 billion tonnes from 16.8 billion tonnes, while 198,462 metres of exploration drilling were completed in the first five months—about 40% of the 500,000-metre full-year target. At Miduk, mineable reserves rose 123% to 1.77 billion tonnes and geological resources increased 186% to 2.883 billion tonnes. The Sarcheshmeh cluster’s mineable reserves reached 7.7 billion tonnes at an average grade of 0.41%, with the mine’s operating permit extended through Iranian year 1429 (around 2050–51). Total material extracted during the period exceeded 153 million tonnes, up about 4% year on year; this figure includes sulphide ore, oxide material and waste rock, and is not copper production. The expanded resource and reserve base supports Iran’s longer-term development potential, but does not imply an immediate increase in supply.
8 hours ago
MCC's Saindak copper smelter was shut down for nearly 10 months before resuming production. - Shanghai Metals Market (SMM)