Ministry of Industry and Information Technology: speed up the recovery and utilization of decommissioned power batteries and promote the construction of typical demonstration projects for echelon utilization in four regions.

SMM News: recently, the Ministry of Industry and Information Technology issued the "Synergetic Transformation and upgrading Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)," which pointed out that the recycling of decommissioned power batteries will be accelerated. Beijing, Tianjin, Hebei and its surrounding areas are the areas with the largest scale of promotion and application of new energy vehicles in China, giving full play to the advantages of backbone enterprises, scientific research institutions, industry platforms and third-party institutions, and strengthening regional complementarity. Unified 4 to promote the construction of regional recycling system. We will promote the construction of typical demonstration projects of echelon utilization in Shanxi, Shandong, Hebei, Henan and Inner Mongolia in the fields of energy storage and power backup of communication base stations. We will support the construction of power battery resource utilization projects and comprehensively improve the recycling and disposal capacity of decommissioned power batteries in the region. The details are as follows:

The competent departments of industry and informatization in Beijing, Tianjin, Hebei, Shanxi, Inner Mongolia Autonomous region, Shandong Province and Henan Province:

In order to implement the strategy of coordinated development of Beijing, Tianjin and Hebei, accelerate the coordinated transformation and upgrading of industries in the comprehensive utilization of industrial resources in Beijing, Tianjin, Hebei and its surrounding areas, improve the efficiency of regional resources utilization, cultivate new green momentum, and promote high-quality regional development, we have formulated the Beijing-Tianjin-Hebei and surrounding areas Industrial Synergetic Transformation and upgrading Plan (20-2022). It is now printed and distributed to you, please implement it conscientiously. Annex: industrial Synergetic Promotion Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)

Policy interpretation: interpretation of the Synergetic Transformation and upgrading Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)

Scan the code to apply to join the SMM industry communication group:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago
Ministry of Industry and Information Technology: speed up the recovery and utilization of decommissioned power batteries and promote the construction of typical demonstration projects for echelon utilization in four regions. - Shanghai Metals Market (SMM)