Ministry of Industry and Information Technology: speed up the recovery and utilization of decommissioned power batteries and promote the construction of typical demonstration projects for echelon utilization in four regions.

SMM News: recently, the Ministry of Industry and Information Technology issued the "Synergetic Transformation and upgrading Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)," which pointed out that the recycling of decommissioned power batteries will be accelerated. Beijing, Tianjin, Hebei and its surrounding areas are the areas with the largest scale of promotion and application of new energy vehicles in China, giving full play to the advantages of backbone enterprises, scientific research institutions, industry platforms and third-party institutions, and strengthening regional complementarity. Unified 4 to promote the construction of regional recycling system. We will promote the construction of typical demonstration projects of echelon utilization in Shanxi, Shandong, Hebei, Henan and Inner Mongolia in the fields of energy storage and power backup of communication base stations. We will support the construction of power battery resource utilization projects and comprehensively improve the recycling and disposal capacity of decommissioned power batteries in the region. The details are as follows:

The competent departments of industry and informatization in Beijing, Tianjin, Hebei, Shanxi, Inner Mongolia Autonomous region, Shandong Province and Henan Province:

In order to implement the strategy of coordinated development of Beijing, Tianjin and Hebei, accelerate the coordinated transformation and upgrading of industries in the comprehensive utilization of industrial resources in Beijing, Tianjin, Hebei and its surrounding areas, improve the efficiency of regional resources utilization, cultivate new green momentum, and promote high-quality regional development, we have formulated the Beijing-Tianjin-Hebei and surrounding areas Industrial Synergetic Transformation and upgrading Plan (20-2022). It is now printed and distributed to you, please implement it conscientiously. Annex: industrial Synergetic Promotion Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)

Policy interpretation: interpretation of the Synergetic Transformation and upgrading Plan for the Comprehensive Utilization of Industrial Resources in Beijing, Tianjin, Hebei and its surrounding areas (2020-2022)

Scan the code to apply to join the SMM industry communication group:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
13 mins ago
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
Read More
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] On March 12, 2026, the US International Trade Commission (ITC) ruled against imposing tariffs on graphite imports from China. Below is the complete timeline of the US anti-dumping and countervailing duty (AD/CVD) investigation into China’s active anode material (graphite anode) imports, the duty rates at each stage, and the latest outcome as of March 12, 2026.
13 mins ago
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
2 hours ago
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Read More
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Recently, the National Development and Reform Commission (NDRC) issued the Reply on the Approval of the Hami–Dunhuang Third 750 kV Transmission Line Project, formally approving the Xinjiang Hami–Dunhuang Third 750 kV Transmission Line Project. The implementation of this project was of great significance for improving the backbone structure of the main power grid in Northwest China, strengthening the mutual support capacity between the Gansu and Xinjiang power grids, and enhancing Xinjiang’s capacity to absorb new energy. According to previously disclosed environmental impact assessment information, the project had a total static investment of 1.3509 billion yuan and was scheduled for completion in March 2027.
2 hours ago
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
2 hours ago
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Read More
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
On March 12, it was learned from State Grid Jilin Electric Power Co., Ltd. that the project to transmit power from the Songliao Clean Energy Base in Northeast China to North China (the “Jijing UHV DC Project”) officially entered the final stage of the feasibility study. According to the plan, the project is expected to complete project approval in 2026, enter the substantive construction phase in 2027, and be completed and put into operation in 2029.
2 hours ago
Ministry of Industry and Information Technology: speed up the recovery and utilization of decommissioned power batteries and promote the construction of typical demonstration projects for echelon utilization in four regions. - Shanghai Metals Market (SMM)