Greenbeauty: the subsidiary plans to invest 528 million yuan in the high-value recycling project of new energy.

Published: Jul 17, 2020 07:50

SMM News: recently, the company's wholly-owned subsidiary Green Mei (Wuxi) Energy Materials Co., Ltd. (hereinafter referred to as "Wuxi Greenmei" or "Party B") and Wuxi Airport Economic Development Zone Management Committee (hereinafter referred to as "Wuxi Airport Economic Development Zone Management Committee" or "Party A") signed investment in new energy high-value recycling projects.

The project invests 528 million yuan to form an industrial scale of high-value recycling of 100000 new energy vehicles per year, high-value recycling of 100000 sets of power battery packs per year, and a research and development platform for an engineering research center for high-value utilization of power batteries and new energy vehicles in Jiangsu Province. to build an industrial demonstration base and engineering technology research center for green recycling of power batteries and new energy vehicles in Jiangsu Province. It has become the world's advanced recycling and green disposal center for power batteries and new energy vehicles. Party B plans to start construction of the project before October 2020 and is expected to be completed and put into production by September 2022.

Scan the code to apply for admission to the SMM industry exchange group:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
23 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
23 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
23 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
23 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
23 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
23 hours ago