The Democratic Republic of the Congo extends the state of emergency again. Lubumbashi closed the city from Thursday to Saturday.

Published: Jul 8, 2020 21:01
Source: SMM integration, leading the way to Africa

SMM: on the evening of July 7, the province of Haute-Katanga announced that it would abstain from yan on the border between Lubumbashi, Likassi and Kasson, the province's main cities, from Thursday to Saturday. The epidemic in Haute-Katanga province showed a trend of spread, especially recently, seven Chinese employees in a Chinese enterprise camp in Lubumbashi were infected with Xinguan pneumonia, all of which have been quarantined and treated.

Late on Monday, July 6, 2020, President Tshisekedi signed and promulgated a law passed by Congress approving the extension of the state of emergency. The last fifth extension expired at midnight on July 6. This is the sixth extension, starting on July 7, 2020 and ending on July 21, 2020.

It is reported that on the afternoon of July 7, local time, the Democratic Republic of the Congo (DRC) to respond to the new crown epidemic multi-sectoral coordination committee released a message on its website that on July 6, 119 new confirmed cases of new crown pneumonia were confirmed in the Democratic Republic of the Congo (DRC).

There were 79 cases in Kinshasa, 23 cases in Haute-Katanga Province, 8 cases in Central Congo Province, 8 cases in Lualaba Province and 1 case in Chopo Province. On the same day, 10 new cases were cured, 1 new death, 51 suspected cases, and 846 samples were tested on the same day. Up to now, the total number of confirmed cases in China has reached 7659, of which 183cases have died (1 case has yet to be confirmed) and 3236 cases have been cured.

2020 China Ni-Cr stainless Steel Industry Market and Application Development Forum

Scan the QR code, apply for participation or join the SMM metal exchange group

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
19 hours ago
The Democratic Republic of the Congo extends the state of emergency again. Lubumbashi closed the city from Thursday to Saturday. - Shanghai Metals Market (SMM)