[SMM analysis] the operating rate of blast furnace has dropped for four consecutive weeks, and the market has rebounded sharply as scheduled.

Published: Jul 8, 2020 20:28

According to SMM research, the operating rate of blast furnace in the second week of July was 90.1%, down 0.06% from last week. It is estimated that the operating rate will pick up slightly next week.

Since the beginning of this week, the stock market has risen sharply, and market sentiment has picked up somewhat. Superimposed with the news that the Brazilian president has unfortunately infected with the new crown, the market is worried about the contraction of the ore supply side and rekindled the enthusiasm for long ore. Today, the iron ore 09 contract increased by 53000 hands, up 2.74%, continuing to lead the rise in black. Rebar futures also broke through 3700 points, reaching a seven-month high. At present, the contraction of the supply side of steel mills is still continuing. according to the latest research data of SMM, as of July 7, the operating rate of independent electric arc furnace steel mills reached 73.24%, down 4.49% from the same period last week and 11.52% from 84.76% in the same period in June. On the demand side, the market is generally worried that the rainstorm and the college entrance examination will affect the release of short-term demand, but from the actual transaction data, the release of demand is not pessimistic. Driven by strong futures, traders are enthusiastic about replenishment. The trading volume of building materials in the past two days is more than 250000 tons. Once the late weather comes out, demand is expected to recover strongly.

In the context of abundant liquidity and good macro-economy, it is expected that this round of steel price rebound is expected to continue.

Fig. 1 the operating rate of blast furnace has dropped slightly for four consecutive weeks.

Source: SMM Steel

 

Specific research feedback:

Steel mill A (East China): part of the hot metal has been transferred to produce strip steel, and the strip steel profit is slightly better.

Steel mill B (South China): production is normal at present and there is no maintenance plan.

Steel mill C (Huazhong): the output of building materials has decreased, hot metal has been transferred to hot and cold rolling, and the inventory is high.

Steel plant D (southwest): normal full-load production, now the output is the historical peak, inventory has increased, later may be scheduled for maintenance, but has not yet set a time.

Steel plant E (North China): 4000m3 blast furnace shutdown and maintenance is not over, other rolling lines take turns for maintenance.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Sep 7, 2026 15:43
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
Read More
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
JCC Hongyuan Copper's $200M Expansion Project Aims to Boost Capacity to 550,000 mt by 2027
The 300,000 mt/year copper cathode expansion project of JCC Hongyuan Copper, a subsidiary of Jiangxi Copper Corporation, entered the pre-approval public notice stage of its environmental impact assessment on September 4, with a total investment of approximately 1.416 billion yuan. The project is planned to start construction in September 2026 and be completed in December 2027. Upon completion, JCC Hongyuan's total capacity will jump from 250,000 mt to 550,000 mt.
Sep 7, 2026 15:43
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
Sep 3, 2026 19:00
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
Read More
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
Japanese Yen Increases USD/JPY Drops Below 159 Amid Intervention Speculation
[SMM Precious Metal Express] The Japanese yen spiked sharply during Wednesday's trading, with USD/JPY falling below 159 and closing down 0.92% at 158.69, sparking speculation of Japanese currency intervention. The dollar index also dropped sharply, with a weaker dollar environment providing support for precious metals.
Sep 3, 2026 19:00
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
Aug 26, 2026 17:02
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
Read More
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
Wuhu Approves Environmental Impact Assessment for Anhui Motu's 500,000 kVAh Lead-Carbon Battery Project
[Lead-Acid Battery Enterprise Dynamics] Recently, the Wuhu Municipal Bureau of Ecology and Environment issued an approval opinion, and the environmental impact assessment for the annual production of 500,000 kVAh lead-carbon battery assembly project of Anhui Motu Technology Group Co., Ltd. was officially approved. The enterprise will implement various environmental protection measures in accordance with the requirements of the environmental impact assessment approval, advance subsequent preliminary work, and start the project construction after all conditions are ready.
Aug 26, 2026 17:02
[SMM analysis] the operating rate of blast furnace has dropped for four consecutive weeks, and the market has rebounded sharply as scheduled. - Shanghai Metals Market (SMM)