[SMM Analysis] what is the story of zinc's strong breakthrough through the Qiqi pass and the macro-promotion of external fundamentals?

Published: Jul 08, 2020 20:23 (GMT+8)
SMM7 March 8: within the day, the main 2008 contract of Shanghai Zinc rose 1.94%, easily breaking the Wanqi pass to refresh the recent high to 17115 yuan / ton, leading the increase in the non-ferrous sector. Is there any new story brewing about zinc fundamentals? SMM analysis is as follows:

SMM7, March 8:

Within the day, the main 2008 contract of Shanghai Zinc rose 1.94%, easily breaking the Wanqi pass to refresh the recent high to 17115 yuan / ton, leading the increase in the non-ferrous sector. Is there any new story brewing about zinc fundamentals? SMM analysis is as follows:

From a macro point of view, US stocks have repeatedly hit record highs, with the Shanghai Composite Index rising more than 400 points in the past week to refresh its highest level since February 9, 2018, as market risk appetite runs high, providing conditions for a stronger zinc.

In terms of fundamentals, two logics exist at the same time:

First, 1) domestic mineral production has rebounded seasonally, while overseas mines have emerged from the haze of the epidemic. According to the shipping schedule, shipping is expected to arrive in Hong Kong one after another in July, and the overall domestic mineral supply is expected to continue to increase month-on-month, reflected in processing fees, which have recently recorded an increase of about 100m / t. With the passage of time, the shortage of mine supply will gradually ease and continue to tilt towards oversupply. 2) in terms of smelter output, with the rebound of zinc prices and processing fees, smelter profits are gradually repaired, while domestic refineries basically carried out a round of maintenance in the first half of the year, and the equipment is operating normally, under this expectation, as long as the profit level is sufficient, smelter output will be maintained at a high level, and the output in July is expected to be repaired to more than 500000 tons. With the end of inspection and repair, domestic production still has room for further recovery. 3) the period from July to August belongs to the off-season of consumption limited by the natural conditions of the high temperature and rainy season in the south and the north, and there is no possibility of better than expected short-term consumption. According to the logical deduction of industrial product supply pricing, the fundamental performance of zinc is weak, which is more valuable as a hedge.

Second, due to the epidemic in 2020, the impact of the mine end is relatively significant. SMM has followed up the mines of overseas groups with a reduction of nearly 400000 tons. At the same time, due to the impact of the epidemic on cash flow, some investment plans have run aground, while the low zinc price lacks profit-driven. Some new and expanded mines have been delayed to put into production. SMM expects that the actual increment in 2020 will be only about 300000 tons, which is much smaller than the expected increment a year ago. That is, zinc also needs to be repriced in the face of the fundamentals of epidemic reshaping. As far as non-ferrous varieties are concerned, at present, only zinc and nickel have not returned to the previous price level, that is, the possibility of underpricing of zinc constitutes the motivation to buy.

SMM believes that: direction deviates from two sets of logic coexist, zinc price trend depends on the choice of funds, boosted by macro optimism, hot money continues to pour into the market, shorting pressure is greater, today is in the early stage of zinc price breakthrough, SMM recommends careful wait and see, focus on whether the main zinc can stand firm at the Qianqi level, and cover the possibility of 17400 yuan / ton above the gap.

 

 

Click to sign up for SMM 2020 (15th) lead and Zinc Summit

Scan the QR code in the picture to sign up for the lead-zinc summit and fill in the personal information on the last page. The meeting staff will contact you later!

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
21 hours ago
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
Read More
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
【Flash | InP-Integrated AI Optical Engines Enter Volume Shipments】
NewPhotonics and Tower Semiconductor announced high-volume shipments of laser-integrated optical engines for AI infrastructure. The 800G and 1.6T PICs use Tower’s PH18DA silicon-photonics platform with heterogeneously integrated InP components, enabling lasers, SOAs, modulators and photodetectors on one chip. Volume shipments of 6.4T NPO chipsets are planned for H1 2027. SMM believes this signals that AI optical-interconnect demand is translating into InP device demand, supporting high-purity indium consumption. However, shipment volumes and InP intensity were not disclosed, so the near-term indium uplift cannot yet be quantified.
21 hours ago
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Sep 25, 2026 09:58 (GMT+8)
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Read More
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Blue Moon to acquire Turner copper-gold-zinc VMS deposit with historical zinc resource
Blue Moon Metals announced that it has signed a definitive agreement to acquire 100% of the Turner copper-gold VMS deposit in Oregon from Gold Coast Mining. Consideration comprises US$4.7 million in cash, 4,778,761 Blue Moon shares valued at about US$27 million based on the 20-day VWAP, and up to US$7 million in milestones tied to underground exploration/development permitting, mining permits and commercial production. Closing is expected in November 2026, subject to TSX Venture Exchange approval and customary conditions. Turner is a past-producing Cyprus-type VMS deposit containing copper, gold, zinc, silver and cobalt. Its 2010 historical estimate reported 2.447 million short tons of Indicated material grading 2.65% zinc and 2.084 million short tons of Inferred material grading 2.78% zinc. The company expects permitting for exploration drilling and underground development to take 12–18 months.
Sep 25, 2026 09:58 (GMT+8)
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
Sep 24, 2026 17:22 (GMT+8)
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
Read More
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
End-use demand underperforms, zinc oxide operating rates edge down [SMM Zinc Oxide Weekly Review]
[Poor end-use demand performance, zinc oxide operating rate edges down] From the perspective of end-use demand performance, in the rubber-grade zinc oxide sector, tire enterprise orders are generally weak, and purchases of zinc oxide remain just-in-time; orders in the desulfurization field perform poorly, with demand remaining sluggish...
Sep 24, 2026 17:22 (GMT+8)