Production data of Electrolytic Aluminum and Alumina in China from SMM in June

Published: Jul 8, 2020 18:29
In June 2020, SMM China produced 3.004 million tons of electrolytic aluminum, an increase of 2.42 percent over the same period last year. By the end of June, the national operating capacity of electrolytic aluminum was 36.76 million tons per year. In June, SMM China produced 5.709 million tons of alumina, of which metallurgical grade alumina was 5.499 million tons, and the average daily output of metallurgical grade was 183000 tons, up 1.82 percent from the previous month and down 4.57 percent from the same period last year.

SMM, July 8:

Electrolytic aluminum:

According to SMM data, 3.004 million tons of electrolytic aluminum were produced in China in June 2020 (30 days), an increase of 2.42 per cent over the same period last year. By the end of June, the national operating capacity of electrolytic aluminum was 36.76 million tons / year, the completed capacity was 41.23 million tons / year, and the operating rate of national electrolytic aluminum enterprises was 89 percent. The overall operating rate was 0.3 percent higher than that at the end of May 2020. By the end of June, the operating capacity of domestic electrolytic aluminum has increased by 180000 tons / year compared with the end of May. Since June, under the stimulation of high profits, the domestic electrolytic aluminum production capacity has been gradually put into operation, and the monthly output growth rate has accelerated compared with the same period last year.

In the first half of 2020, the cumulative output of domestic electrolytic aluminum was 18.009 million tons, an increase of 2.93% over the same period last year; the cumulative consumption of domestic electrolytic aluminum was 17.69 million tons, and the cumulative year-on-year decline rapidly narrowed to 0.18%. Electrolytic aluminum continued to go to the warehouse in June, mainly due to the temperature at the supply end and the rise in demand for aluminum downstream. In July, the new capacity of electrolytic aluminum in Yunnan, Inner Mongolia and other places will continue to increase, and net imports are expected to increase slightly compared with June. SMM estimates that domestic electrolytic aluminum production in July (31 days) is 3.12 million tons, an increase of 1.79% over the same period last year, and the monthly consumption growth rate will narrow around 6.15% as supply rises and the margin of demand weakens.

Source: SMM

Alumina:

According to SMM data, China produced 5.709 million tons of alumina in June (30 days), of which metallurgical grade alumina was 5.499 million tons, and the average daily output of metallurgical grade was 183000 tons, an increase of 1.82% from the previous month and a decrease of 4.57% from the same period last year. In the first half of the year, China's cumulative metallurgical grade alumina output was 32.641 million tons, 7.6% lower than the same period last In the context of the mild rise in alumina prices during the month, the annual operating capacity of alumina in the northern region increased slightly compared with May, and the production reduction of individual alumina plants at the end of the month did not affect the output of that month.

As of the first ten days of July, the operating capacity of metallurgical grade alumina is 66.9 million tons, and the output of metallurgical grade alumina is expected to be 5.54 million tons in July (31 days), with the average daily output rising slightly to 184700 tons. On the whole, China's alumina market is still a month of increasing and reducing production in July. In terms of production reduction, the new materials of Chinalco Huaxing and Shanxi began to produce flexibly at the end of the month, and some alumina plants in southwest China had a roaster maintenance plan in July. In terms of increasing production, Guodian's Shanxi and Henan alumina plants have resumed or plan to resume production. Guodian Investment Sichuan will mass produce alumina products in July, and under the stimulation of rising alumina prices, there may be more reduced production capacity to resume production.

Source: SMM

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
21 hours ago
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
Read More
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
Federal Reserve Governor Milan pointed out that it is necessary for the US Fed to cut interest rates by more than 100 basis points this year. At the same time, he is very much looking forward to the performance of Kevin Warsh as Fed Chairman. However, Richmond Fed President Barkin emphasized that monetary policy must remain cautious until inflation fully pulls back to the target level, thereby ensuring the stability of the labour market.
21 hours ago
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
21 hours ago
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
Read More
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
All 11 Democratic members of the US Senate Banking Committee jointly sent a letter to the committee's chairman, Tim Scott, requesting that all nomination processes for the prospective Fed Chairman, Kevin Warsh, be postponed until the criminal investigation into current Fed Chairman Powell and other board members is concluded. However, Scott stated that Warsh's confirmation was a done deal.
21 hours ago
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
21 hours ago
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
Read More
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
The US Fed has announced that it will maintain the capital levels of large banks unchanged during the upcoming stress test cycle (corresponding to the 2026 cycle). At the same time, the US Fed is planning multidimensional reforms to this annual test, aiming to enhance its transparency. The US Fed's Vice Chair for Supervision, Bowman, revealed that adjustments to the stress capital buffer requirements for large banks will be postponed until 2027. This move is intended to provide the US Fed with sufficient time to evaluate potential flaws that may be exposed in its testing models when assessing banks' financial conditions under simulated economic downturn scenarios.
21 hours ago
Production data of Electrolytic Aluminum and Alumina in China from SMM in June - Shanghai Metals Market (SMM)