[SMM afternoon Review] Tianjin Zinc: the absolute price remains high and the transaction in Tianjin turns bad again.

Published: Jul 08, 2020 11:37 (GMT+8)

SMM7, March 8:

The mainstream trading of zinc ingots in Tianjin market was 16900mur16970 yuan / ton, Zijin was traded at 17000mur17040 yuan / ton, Huludao was quoted at 18170 yuan / ton, Zinc was generally quoted around RMB130 / ton to 160yuan / ton for 2007 contract, Zijin was quoted around 230yuan / ton for July contract, and the Tianjin stock market remained at around 60,000,000 yuan / ton compared with Shanghai stock market. Today, Shanghai zinc remains volatile, the spot market maintains a rising discount price, and the price is relatively uniform. The ordinary brand Bering News quoted a rise of 150 yuan per ton for the 07 contract, and Hongyi quoted a rise of 160 yuan per ton for the 07 contract. Chi Hong quoted a rise of 130 yuan per ton for the 07 contract, while the high-priced brand Zijin quoted a rise of 230 yuan per ton for the July contract, and Baiyin quoted a rise of 130 yuan per ton for the 07 contract. Yunxi Daily quoted 100 yuan / ton of water for 07 contract, Xikuang (delivered) quoted 120 yuan / ton of water for 07 contract, fourth Ring Road (delivered) quoted 120 yuan / ton of water for 07 contract, KZ quoted 80 yuan / ton of water for 07 contract, and Harbin Zinc (including depot) quoted 60PRI 70 yuan / ton for 07 contract. The price of Yun Tin News is 100 yuan / ton for 07 contract, 120 yuan / ton for 07 contract, 80 yuan / ton for 07 contract, 6070 yuan / ton for Harbin zinc (including out of storage). Today, zinc prices remain volatile, the rising discount has not changed, the recent transactions are poor, traders are weak, the brands only low price Chihong transaction is relatively good; downstream, today's market rose slightly, the absolute price has not changed, the downstream willingness to receive goods is weaker. On the whole, today's turnover is weaker than that of yesterday. Zinc ingots were sold at around 16,800Muth16850 yuan / ton.

Brand

Discount (11:15)

Chi Hong

Hong Ye

Seven hundred and sixty

Lark

Seven hundred and fifty

Purple gold

7: 230

Huludao

7: 1360

Silver

7: 130

Fourth Ring Road (delivered)

7: 120

West Mine (delivered)

7: 120

Yunnan tin

Seven hundred

KZ/YP

780

Ha Zinc (exempt from the library)

7, 60, 60, 70.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
2 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
2 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
6 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
6 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
6 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
6 hours ago