The trial operation of the first production line of the innovative metal annual output of 800000 tons of high-strength and high-toughness aluminum alloy project

Published: Jul 7, 2020 10:43

SMM News: July 1, Innovation Metal annual output of 800000 tons of high-strength and high-toughness aluminum alloy project the first production line completed the preliminary commissioning, officially entered the trial production stage.

As a major 2020 "double invitation and double introduction" project in Binzhou City, the project has a total investment of 1.08 billion yuan and adopts the provincial-level scientific and technological achievements of the company's own property rights, "High-strength and high-toughness aluminum alloy short process alloying process research and specialization" technology. It mainly produces high-end aluminum alloy materials in high-speed rail, light rail, automobile lightweight and other fields, which can effectively meet the needs of aluminum alloy materials for special equipment for rail transit in our country.

It is understood that the construction of the project is planned to be completed in three phases this year, of which the first phase of the project will invest 200 million yuan and build new production workshops, warehouses, dormitory buildings and other public auxiliary facilities of 187000 square meters; the second phase of the project will invest 300 million yuan to install 79 sets (sets) of major equipment such as tilting melting furnaces, crystallizers, homogenizing furnaces, dust collectors, and so on, and complete the construction and operation of 5 production lines. The third phase of the project invested 580 million yuan, installed 99 sets (sets) of tilting melting furnace, mould, homogenizing furnace, dust collector and other main equipment, completed the construction of 7 production lines and put into operation. After all the projects are put into production, the annual sales income will be 14 billion yuan, profits and taxes will be 990 million yuan, and 400 jobs will be provided.

Scan the QR code and join the SMM metal communication group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
South 32 revised Q2 ‘2026 CIF MJP Premium offer is US$353/mt.
1 hour ago
South 32 revised Q2 ‘2026 CIF MJP Premium offer is US$353/mt.
Read More
South 32 revised Q2 ‘2026 CIF MJP Premium offer is US$353/mt.
South 32 revised Q2 ‘2026 CIF MJP Premium offer is US$353/mt.
According to the latest market news:South 32 revised Q2 ‘2026 CIF MJP Premium offer is US$353/mt.
1 hour ago
ChenZhi Lightweight's New Distributed Electric Drive Rear Subframe Product Delivered
2 hours ago
ChenZhi Lightweight's New Distributed Electric Drive Rear Subframe Product Delivered
Read More
ChenZhi Lightweight's New Distributed Electric Drive Rear Subframe Product Delivered
ChenZhi Lightweight's New Distributed Electric Drive Rear Subframe Product Delivered
[SMM News Flash] According to reports, prototype samples of the new distributed electric drive rear subframe product at ChenZhi Lightweight's Ya'an base completed the first round of bundled delivery. The trial production of the new product took only from March 5, when the molds arrived at the plant, to March 10, when the first batch of products was delivered. Every process, from core making and casting to detection, was carried out manually. This verified the process stability of the fully manual production model in terms of both schedule and quality, and accumulated valuable experience for subsequent upgrading of the post-processing unit and large-scale production.
2 hours ago
Anda Co., Ltd. Is Expected to Appear Before the Beijing Stock Exchange Listing Committee
2 hours ago
Anda Co., Ltd. Is Expected to Appear Before the Beijing Stock Exchange Listing Committee
Read More
Anda Co., Ltd. Is Expected to Appear Before the Beijing Stock Exchange Listing Committee
Anda Co., Ltd. Is Expected to Appear Before the Beijing Stock Exchange Listing Committee
[SMM News Flash] According to reports, the Beijing Stock Exchange Listing Committee is scheduled to hold its 28th review meeting of 2026 on the morning of March 20 to examine whether Huzhou Anda Automotive Parts Co., Ltd.'s application for listing on the Beijing Stock Exchange meets the issuance conditions, listing requirements, and information disclosure standards. The pre-review prospectus submitted by Anda Co., Ltd. showed that the company planned to issue no more than 28 million new shares through this Beijing Stock Exchange listing and raise 280 million to invest in the "Intelligent Manufacturing Project for Key Lightweight Automotive Parts."
2 hours ago
The trial operation of the first production line of the innovative metal annual output of 800000 tons of high-strength and high-toughness aluminum alloy project - Shanghai Metals Market (SMM)