[brief Review of lead in SMM period] Changyin lead in Shanghai is finished at night or horizontally.

Published: Jul 3, 2020 17:08

SMM7, March 3:

During the day, the main 2008 contract of Shanghai lead opened at 14730 yuan / tonne. At the beginning of the session, Shanghai lead briefly boosted to an intraday high of 14770 yuan / ton. Shanghai lead opened the road of correction, accelerated away from the daily moving average line after falling below the daily moving average line, and stopped falling after reaching an intraday low of 14615 yuan / ton in the afternoon. The basic metals rose generally in the afternoon, and the low bulls in Shanghai lead entered the market and rebounded somewhat, but stopped at the first line of the daily average line of 14700 yuan. Shanghai lead gave up its gains again in late trading, closing at 14650 yuan / ton, down 140 yuan / ton, or 0.95%. Its position increased by 250 to 26567 lots, and trading volume increased by 2024 to 24663 lots. The bulls left cautiously during the day, and the bears took advantage of the short-term test. Shanghai lead opened high and walked low today, falling below the 5-day moving average, pointing directly to the 10-day moving average, and the KDJ index opened downward, paying attention to the seesaw performance of the multi-empty force in the night market. The disk may be oscillated within the range of the 5-10 moving average.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Lead Futures: LME Outperforms SHFE, Overnight LME Lead Probed Higher to $2,022/mt [SMM Lead Morning Brief]
1 hour ago
Lead Futures: LME Outperforms SHFE, Overnight LME Lead Probed Higher to $2,022/mt [SMM Lead Morning Brief]
Read More
Lead Futures: LME Outperforms SHFE, Overnight LME Lead Probed Higher to $2,022/mt [SMM Lead Morning Brief]
Lead Futures: LME Outperforms SHFE, Overnight LME Lead Probed Higher to $2,022/mt [SMM Lead Morning Brief]
1 hour ago
Bullish and Bearish Factors Coexist in the Market, Lead Prices Expected to Continue Fluctuating at Highs [SMM Lead Morning Meeting Minutes]
1 hour ago
Bullish and Bearish Factors Coexist in the Market, Lead Prices Expected to Continue Fluctuating at Highs [SMM Lead Morning Meeting Minutes]
Read More
Bullish and Bearish Factors Coexist in the Market, Lead Prices Expected to Continue Fluctuating at Highs [SMM Lead Morning Meeting Minutes]
Bullish and Bearish Factors Coexist in the Market, Lead Prices Expected to Continue Fluctuating at Highs [SMM Lead Morning Meeting Minutes]
1 hour ago
Hezhang Dingshengxin Mining Phase I Flotation Plant Project Entered the Equipment Joint Commissioning Stage
14 hours ago
Hezhang Dingshengxin Mining Phase I Flotation Plant Project Entered the Equipment Joint Commissioning Stage
Read More
Hezhang Dingshengxin Mining Phase I Flotation Plant Project Entered the Equipment Joint Commissioning Stage
Hezhang Dingshengxin Mining Phase I Flotation Plant Project Entered the Equipment Joint Commissioning Stage
[Lead-Zinc Miner Updates] Recently, the Phase I flotation beneficiation plant project of Hezhang Dingshengxin Mining Development Co., Ltd. achieved a major milestone, with the semi-autogenous grinding mill and ball mill systems successfully completing no-load joint trial runs. This marked that the Zhugongtang super-large lead-zinc mine's mining and beneficiation project has fully entered the stage of combined equipment commissioning. It is reported that the Phase I flotation beneficiation plant of the Zhugongtang lead-zinc mine is expected to be ready for clean water trial runs by the end of June this year, ready for feed trial runs in August, and is striving to officially enter trial production by the end of September, at which point it will initially achieve a production capacity of proc
14 hours ago
[brief Review of lead in SMM period] Changyin lead in Shanghai is finished at night or horizontally. - Shanghai Metals Market (SMM)