St. George Mining: Mount Alexander nickel sulphide project enters the next phase of development and drilling

Published: Jul 03, 2020 13:38 (GMT+8)

SMM7 March 3: recently, St. George Mining (St George Mining) 's Alexander Mountain Nickel Sulfide (Mt Alexander nickel sulphide project) project in Western Australia has entered the next phase of development and drilling. This week's deep diamond drilling program kicked off in the prospects of investigators, drilling a large 800-meter deep hole aimed at the depth of the ore system. The company has so far completed 4600m of shallow drilling at the Stricklands (Stricklands) deposit and is expected to obtain its first resource within weeks.

After the great success of the shallow drill bit, St. George turned to a deeper target and became the focus of St. George's attention. It is reported that the Alexander Hill nickel sulphide project is located in a gold mine in eastern Western Australia, about 100 kilometers west of Leonola. The project occupies strategic land on an undeveloped cathedral, and St. George's discovery spans more than 16 kilometers, including Strickland, Fairbridge, radar and fishhook mines.

In recent weeks, St. George's drilling program has focused on discovering Strickland (Stricklands) 's high-grade, near-surface nickel resources. Since the beginning of June, in the last month alone, these rods have rotated at a speed of 24am 7 in shallow deposits, with more than 4000 m of RC and 660 m of diamond drilling.

Close drilling in Strickland (Stricklands) has identified a nickel mineralization layer that is 450m long, 50m wide and 80m deep. Drilling and laboratory data will be pumped to Entech, a resource consultant, to speed up JORC modeling of deposits. These are important milestones in the scope study of potential entry-level mines on Mount Alexandria.

The company completed large-diameter diamond core drilling at Stricklands for metallurgical testing as part of its scope-defining study of Stricklands. Cores are currently being prepared for testing in Perth and Canada, and consultant XPS hopes to develop a flowchart to produce nickel concentrates from Strickland ores.

2020 China Ni-Cr stainless Steel Industry Market and Application Development Forum

Scan the QR code, apply for participation or join the SMM metal exchange group

A

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Tubacex October Mo-Bearing Tube Surcharges Are Mixed】
Oct 02, 2026 10:52 (GMT+8)
【Flash | Tubacex October Mo-Bearing Tube Surcharges Are Mixed】
Read More
【Flash | Tubacex October Mo-Bearing Tube Surcharges Are Mixed】
【Flash | Tubacex October Mo-Bearing Tube Surcharges Are Mixed】
Tubacex issued its October tube alloy surcharges. In euros, hot-/cold-finished 316/316L fell from €5.07/€5.59 per kg (€5,070/€5,590 per tonne) to €5.05/€5.56 per kg (€5,050/€5,560 per tonne). High Mo content materials, with Mo above 2.5%, declined from €5.26/€5.79 to €5.23/€5.76 per kg. Surcharges for 2205 and 2507 were unchanged, while 254 SMO rose from €9.64/€10.62 to €9.67/€10.65 per kg. SMM analysis: most Mo-bearing tube grades were flat or slightly lower, while 254 SMO moved higher, indicating differentiated cost transmission across grades.
Oct 02, 2026 10:52 (GMT+8)
[SMM Stainless Steel Flash] India stainless scrap prices diverge as 304 eases with nickel and tight 316 holds firm
Oct 02, 2026 10:50 (GMT+8)
[SMM Stainless Steel Flash] India stainless scrap prices diverge as 304 eases with nickel and tight 316 holds firm
Read More
[SMM Stainless Steel Flash] India stainless scrap prices diverge as 304 eases with nickel and tight 316 holds firm
[SMM Stainless Steel Flash] India stainless scrap prices diverge as 304 eases with nickel and tight 316 holds firm
India's stainless steel scrap market moved in different directions in the week ended 1 October. Domestic 304 scrap prices edged lower and import offers followed, while 316 prices held steady in both the domestic and import markets. Weaker LME nickel prices weighed on 304 sentiment, and buyers stuck to immediate requirements as trading slowed over the festive period. Tight availability limited downside for 316. On procurement, short processing windows following the government's relaxation of Pre-Shipment Inspection Certificate (PSIC) requirements, along with additional import costs, continued to limit mills' flexibility. Some mills are evaluating billets, slabs and nickel pig iron (NPI) as alternatives to scrap to manage input costs. Looking further out, the EU's proposal to restrict metal waste exports to India under its new Waste Shipment Regulation (WSR) would, if adopted, further narrow India's scrap import options. In the near term, 304 scrap faces mild downward pressure if nickel stays weak, while 316 is expected to remain firm as long as supply stays tight. PSIC developments and the relative economics of billets and NPI will be key factors to watch.
Oct 02, 2026 10:50 (GMT+8)
【Flash | Metallus Raises October Molybdenum Surcharge Component for 300M Steel】
Oct 02, 2026 10:47 (GMT+8)
【Flash | Metallus Raises October Molybdenum Surcharge Component for 300M Steel】
Read More
【Flash | Metallus Raises October Molybdenum Surcharge Component for 300M Steel】
【Flash | Metallus Raises October Molybdenum Surcharge Component for 300M Steel】
Metallus set its October raw-material surcharges for Oct 1–30. The Mo component for 300M steel rose 0.52% to $15.176/cwt, about $334.57/t of steel, from $15.098/cwt, or $332.85/t. The listed total surcharge increased 1.03% to $45.054/cwt. Scrap rose to $17.750/cwt, while the separate energy surcharge for bars and tubes fell from $1.296/cwt, about $28.57/t, to $0.050/cwt, or $1.10/t.
Oct 02, 2026 10:47 (GMT+8)