SMM7 2nd Ningbo zinc ingot stock

Published: Jul 02, 2020 11:48 (GMT+8)
SMM7 March 2: the mainstream transaction of Ningbo Gao was 16960 Mel 17060 yuan / ton, the ordinary brand contract water for 2007 was around 80 Mel 90 yuan / ton, and the price difference between Ningbo and Shanghai ordinary brand maintained around 10 yuan / ton yesterday.

SMM7, March 2:

The mainstream transaction of Ningbo Gao was 16960 Mel 17060 yuan / ton, and the price difference between Ningbo and Shanghai ordinary brands was maintained around 10 yuan / ton yesterday, while the contract water for ordinary brands of ordinary brands in Ningbo was around 2007 yuan per ton, while the price difference between Ningbo and Shanghai ordinary brands was maintained around 10 yuan per ton yesterday. Today, shipments in the Ningbo market are still relatively weak. In the first session of the morning, Tiefeng reported a water increase of 90 yuan per ton for the July contract, while the West Mining News raised 80 yuan per ton for the July contract, and a small amount of Kirin pushed down the price. It was reported that the water rose 90 yuan per ton for the July contract. Enter the second period of time, the market rising water changes less, basically maintained at the contract life in July although 80 RMB90 / ton. Overall, Ningbo market supply slightly tightened, mainly due to weak consumption, some refinery delivery direction has shifted, today's downstream enterprises are mainly wait-and-see, the overall trading is still light.

Scan the QR code and apply to join the SMM metal exchange group. Please indicate the company + name + main business.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
8 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
8 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
12 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
12 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
12 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
12 hours ago