Chinalco’s general manager: Blind copper smelting capacity expansion should be strictly curbed

Published: May 22, 2020 15:15 (GMT+8)
Structural contradictions of China’s copper smelting sector have intensified overcapacity woes, heightened reliance on foreign ore and boosted environmental pressure, Yu Thursday told China Nonferrous Metals News on the sidelines of the annual meeting of China’s legislature, the National People’s Congress.

SHANGHAI, May 22 (SMM) – Blind expansion of copper smelting capacity in China should be strictly curbs to facilitate high-quality development of the copper industry, said Yu Dehui, Chinalco’s general manager and member of the National Committee of the Chinese People’s Political Consultative Conference, the country’s top political advisory body.

 

Structural contradictions of China’s copper smelting sector have intensified overcapacity woes, heightened reliance on foreign ore and boosted environmental pressure, Yu Thursday told China Nonferrous Metals News on the sidelines of the annual meeting of China’s legislature, the National People’s Congress.

 

China’s refined copper capacity in China reached 12.59 million mt per year in 2019, while investment in the sector grew 40.9%. Production of refined copper for the year was 9.78 million mt, pointing to a capacity utilisation rate of just 77%, according to Yu.

 

The capacity is expected to expand to 14.22 million mt per year in 2021, widening the glut.

 

China’s copper concentrate self-sufficiency rate, meanwhile, has fallen to 22.8%, from 43.25% in 2000.

 

Yu also mentioned sulphuric acid overcapacity woes, which sparked the risks of storage filling up amid the COVID-19 outbreak earlier this year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
5 hours ago
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
Read More
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
AusQuest CSAMT survey outlines 2.5 km by 1 km porphyry footprint at Peru's Cangallo
AusQuest (ASX:AQD) has released results of a Controlled Source Audio-frequency Magnetotelluric (CSAMT) survey at its 100%-owned Cangallo porphyry copper-gold project in southern Peru, carried out by Quantec Geoscience. The survey outlines an interpreted mineralised porphyry footprint of at least 2.5 km by 1 km and identifies two additional high-priority targets east and west of the known system whose resistivity signatures resemble the main Cangallo porphyry. Deeper low-resistivity anomalies (250-400 ohm-metres) beyond 500 m at the northern and southern margins point to untested porphyry centres now ranked as priority drill targets. Cangallo spans about 60 km2 near the coast; prior RC drilling confirmed mineralisation over 1,500 m of strike, 250-500 m wide and beyond 400 m depth, with broad intervals around 0.5% copper. Follow-up drilling begins once Stage 4 permits are secured.
5 hours ago
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
5 hours ago
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
Read More
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
Peru's Jan-Jul copper output rises 2.2% as Antamina and Las Bambas lead mines
Peru's Ministry of Energy and Mines (MINEM) reported national copper output of 1,599,115 tonnes in the first seven months of 2026, up 2.2% year on year, with July production of 236,515 tonnes rising 3.7% on higher output at Antamina (+83%) and Cerro Verde (+18%). On a mine basis, Antamina produced 297,145 tonnes through July, a 54% jump and a 14.3% national share, held by BHP, Glencore, Teck and Mitsubishi. MMG's Las Bambas yielded 245,610 tonnes (-1.1%; 14.83% share), ranking as the No. 2 copper mine, while Freeport's Cerro Verde produced 231,023 tonnes and Southern Copper's Peruvian unit 218,213 tonnes (-10.3%). Antamina and Las Bambas lead on a mine-level basis, underscoring a steady recovery in Peruvian supply that buffers a globally tight concentrate market.
5 hours ago
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
5 hours ago
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
Read More
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
Aldebaran flags near-2 km continuous mineralisation at Altar copper-gold system
Aldebaran Resources (TSX-V:ALDE) has closed out the 2025-2026 infill and geotechnical campaign at its Altar copper-gold project in San Juan, Argentina, with hole ALD-26-260 returning 1,728.9 m (close to 2 km) of continuous mineralisation grading 0.45% CuEq from 141 m, including 756 m at 0.68% CuEq at depth. CEO John Black said the more-than-1.7-km interval in a single hole underscores the enormous scale of the Altar system. Since the late-2024 resource estimate, over 40,000 m have been drilled at the main deposit, with about 30,000 m at the adjacent Pórfido Radio target still outside any resource. The infill work is designed to upgrade Inferred resources to Measured and Indicated categories and to feed a 2026 resource update and the 2027 pre-feasibility study. Altar comprises several copper-gold porphyry deposits; Aldebaran holds an 80% interest.
5 hours ago