April SMM China Electrolytic Aluminum and Alumina production capacity data

Published: May 9, 2020 17:50
SMM China's electrolytic aluminum production in April 2020 was 2.958 million tons, an increase of 2.4% over the same period last year. By the end of April, the national electrolytic aluminum production capacity was 36.51 million tons / year. In April, SMM China's alumina production was 5.645 million tons, including 5.395 million tons of metallurgical grade alumina and 179800 tons of metallurgical grade daily output, an increase of 2.61% over the previous month, down 7.07% from the same period last year.

SMM, 9 May:

Electrolytic aluminum:

According to SMM data, China's electrolytic aluminum output in April 2020 (30 days) was 2.958 million tons, an increase of 2.4 percent over the same period last year. By the end of April, the operating capacity of electrolytic aluminum in China was 36.51 million tons / a, with an annual capacity of 41.23 million tons / year. The operating rate of electrolytic aluminum enterprises in China was 88.5%. The overall operating rate was 0.7 percentage points higher than that at the end of March 2020. by the end of April, The operating capacity of domestic electrolytic aluminum increased by 300000 tons / year compared with the end of March. Aluminum prices bottomed out in early April, the proportion of production capacity with cash loss narrowed, SMM statistics cumulative maintenance capacity reduced to 570000 tons / year, at the same time, Inner Mongolia, Yunnan and other provinces have new and resumed production capacity as scheduled.

From January to April 2020, the cumulative output of domestic electrolytic aluminum was 11.934 million tons, an increase of 3.6% over the same period last year. From January to April, the cumulative consumption of domestic electrolytic aluminum was 10.7 million tons, down 5.5% from the same period last year. Driven by strong domestic demand, the social inventory of domestic electrolytic aluminum was quickly removed. In May, under the support of aluminum prices, it is expected that new electrolytic aluminum production capacity will continue to be put into production as planned, while the scale of overhaul and reduced production capacity will be narrowed. SMM estimates that domestic electrolytic aluminum production in May (31 days) will be 3.07 million tons, down to 0.1 percent year-on-year growth rate.

Source: SMM

Alumina:

According to SMM data, in April (30 days), China produced 5.645 million tons of alumina, of which metallurgical grade alumina was 5.395 million tons, and the average daily output of metallurgical grade was 179800 tons, an increase of 2.61% from the previous month, down 7.07% from January to April. China's cumulative metallurgical grade alumina production decreased by 8.61% from January to April. Alumina prices hit bottom in April, and the area of production reduction affected by the epidemic in Shanxi and Henan has narrowed. At the same time, the production of some imported ore production lines invested by Guodian in Shanxi, Luoyang Wanji and Chongqing Bosai has been reduced within the month. Under the background of increasing and decreasing production, the average daily output of alumina in April was slightly higher than the previous month.

As of early May, the operating capacity of metallurgical grade alumina was 65.08 million tons. In May (31 days), the output of metallurgical grade alumina is expected to be 5.527 million tons, and the average daily output has dropped slightly to about 178000 tons. This is mainly due to the further reduction of production in the import line of some northern alumina plants (Chinalco, Shanxi, etc.). The reduction of production is possible. It is necessary to pay continuous attention to the changes of imported ore production lines in Shanxi and Henan areas and the willingness to reduce production capacity and resume production capacity under the condition of mild price increases.

Source: SMM

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
14 hours ago
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
Read More
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
Fed Governor Milan Pushes for Over 100 Basis Points Cut, Contradicts Barkin on Caution
Federal Reserve Governor Milan pointed out that it is necessary for the US Fed to cut interest rates by more than 100 basis points this year. At the same time, he is very much looking forward to the performance of Kevin Warsh as Fed Chairman. However, Richmond Fed President Barkin emphasized that monetary policy must remain cautious until inflation fully pulls back to the target level, thereby ensuring the stability of the labour market.
14 hours ago
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
14 hours ago
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
Read More
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
Democratic Senators Demand Delay in Fed Nomination Amid Criminal Investigation
All 11 Democratic members of the US Senate Banking Committee jointly sent a letter to the committee's chairman, Tim Scott, requesting that all nomination processes for the prospective Fed Chairman, Kevin Warsh, be postponed until the criminal investigation into current Fed Chairman Powell and other board members is concluded. However, Scott stated that Warsh's confirmation was a done deal.
14 hours ago
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
14 hours ago
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
Read More
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
Fed to Keep Large Banks' Capital Levels Unchanged, Postpones Stress Test Reforms Until 2027
The US Fed has announced that it will maintain the capital levels of large banks unchanged during the upcoming stress test cycle (corresponding to the 2026 cycle). At the same time, the US Fed is planning multidimensional reforms to this annual test, aiming to enhance its transparency. The US Fed's Vice Chair for Supervision, Bowman, revealed that adjustments to the stress capital buffer requirements for large banks will be postponed until 2027. This move is intended to provide the US Fed with sufficient time to evaluate potential flaws that may be exposed in its testing models when assessing banks' financial conditions under simulated economic downturn scenarios.
14 hours ago