SMM May 8 Lithium Cobalt spot Express: market transaction Cold Lithium Cobalt Price stalemate

Published: May 8, 2020 11:45
[SMM May 8th Lithium Cobalt spot Express] the current market mainstream lithium cobalt price is 19.1-196000 yuan / ton, the current market long unit price is mainly 18.5-190000 yuan / ton, downstream battery factory procurement is still inquiring. Upstream cobalt raw materials, cobalt salt, cobalt oxide high price, downstream cobalt lithium battery factory pressure price, lithium cobalt acid price is still deadlocked, trading sporadic today. The downstream lithium cobalt battery entered the off-season in May, and the purchase of feedback raw materials for lithium cobalt battery factories decreased slightly compared with April. A small number of lithium cobalt manufacturers reported that the order of lithium cobalt in May was lower than that in April, and the feedback reduction of most manufacturers was not much.

SMM5 8: the current market mainstream lithium cobalt price is 19.1-196000 yuan / ton, the current market long single price is mainly 18.5-190000 yuan / ton, downstream battery factory procurement is still in inquiry. Upstream cobalt raw materials, cobalt salt, cobalt oxide high price, downstream cobalt lithium battery factory pressure price, lithium cobalt acid price is still deadlocked, trading sporadic today.

Downstream lithium cobalt oxide battery entered the off-season in May, lithium cobalt battery manufacturers reported that the purchase of raw materials decreased slightly compared with April. A small amount of lithium cobalt manufacturers reported that lithium cobalt orders decreased in May compared with April, while most manufacturers reported little reduction.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago