SMM Morning Comments (May 6): Shanghai base metals opened mostly higher after holiday

Published: May 06, 2020 09:55 (GMT+8)
SHFE nonferrous metals opened mostly higher Wednesday as trading resumed from the five-day Labour Day holiday, on the back of optimism that more economies are moving toward easing lockdowns.

SHANGHAI, May 6 (SMM) – SHFE nonferrous metals opened mostly higher Wednesday as trading resumed from the five-day Labour Day holiday, on the back of optimism that more economies are moving toward easing lockdowns.


Tin added about 1.5%, aluminium climbed more than 1%, while nickel shed over 2% and copper edged lower. The SHFE night trading session will resume today as the spread of the coronavirus has stalled domestically. 


LME base metals rose across the board on Tuesday. Nickel was the best performer with a rise of 1.95%. Copper advanced 0.92%, aluminium gained 0.37%, zinc added 1.03%, tin climbed 0.4% and lead increased 0.58%.


Oil futures surged Tuesday, with nearest delivery West Texas Intermediate futures and Brent crude on Intercontinental Exchange rising to their highest settlements in 2 1/2 weeks, bolstered by the hope of a rise in demand following the reopening of major economies in Asia, the eurozone and the US.


Aluminium: Three-month LME aluminium edged higher on Tuesday with support from an extended rally in oil futures and improved demand outlook. The most-traded SHFE June contract continued to trend upward on Wednesday morning, with the trading range expected at 12,500-12,800 yuan/mt today. Spot premiums are likely at 60-80 yuan/mt. 


Zinc: The oil price rally lifted three-month LME zinc, which rebounded from an intraday low of $1,897.5/mt and ended 1.03% higher on the day at $1,920.5/mt. LME zinc inventories shrank 175 mt, or 0.17% on Tuesday to 100,675 mt. While some European countries and US states announced plans to reopen economy, the lingering impact of the coronavirus may see overseas demand returning at a slow pace. Today, LME zinc is expected to trade between $1,900-1,950/mt with the most-active SHFE contract trading at 16,000-16,500 yuan/mt. Accelerated infrastructure construction will continue to bolster domestic zinc consumption. 


Nickel: Three-month LME nickel closed higher for the first time since last Friday, as it regained losses and broke up the daily, the 20- and five- day moving averages to end Tuesday at $12,030/mt, up 1.95% on the day. Demonstrations occurred at the Indonesian Weda Bay Industrial Park of Tsingshan Indonesia on Labour Day, but its impact on supply is not significant so far. High production schedule at domestic stainless steel mills will support nickel fundamentals. Today, LME nickel is expected to test support from $12,000/mt. 


Lead: Three-month LME lead bounced back after slipped to a session low of $1,621/mt with strong support from $1,600/mt. It finished Tuesday 0.58% higher at $1,641.5/mt. 

 

Tin: Three-month LME tin closed 0.4% higher overnight at $15,185/mt amid decreasing inventories. Support below is expected from $15,000/mt with pressure above from $15,600/mt. The most-active SHFE contract will also remain at high levels today and test resistance from 132,000 yuan/mt. 

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
6 hours ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
6 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
7 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
7 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
7 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
7 hours ago