SMM Morning Comments (Apr 28): Shanghai base metals mostly dipped after Monday's rally

Published: Apr 28, 2020 09:51 (GMT+8)
SHFE nonferrous metals traded mostly lower on Tuesday morning, following a broad rally on Monday, as investors weighed the Chinese government decision to support metal stockpiling and foreign countries reopening plans.

SHANGHAI, Apr 28 (SMM) – SHFE nonferrous metals traded mostly lower on Tuesday morning, following a broad rally on Monday, as investors weighed the Chinese governments decision to support metal stockpiling and foreign countries reopening plans. 


Copper shed close to 1% in early morning trades, with tin and nickel losing more than 1%. Aluminium, meanwhile, traded marginally higher, after a 1.1% rise Monday. 


US oil futures resumed declines Monday, dipping almost 25% as reignited concerns about storage capacity shortage amid overflow of crude sent the June contract to its second-lowest settlement on record.


LME base metals ended mixed Monday, with tin advancing 3.35% to become the best performer. Zinc climbed 1.27%, lead added 0.77%, while copper shed 0.04%, aluminium fell 0.5% and nickel slipped 0.12%.


With a slowdown in the spread of the coronavirus, plans to partially reopen the economy announced by a number of countries and US states boosted investor sentiment, with certain businesses poised to benefit from the first wave of consumers emerging from the coronavirus driven quarantine.

 

Copper: Three-month LME copper failed to hold onto gains from last Friday, decreasing 0.04% overnight due to again plunged oil prices. Supply concerns on the raw materials front remain as coronavirus crisis in South America showed no signs of easing. Today, LME copper is likely to trade between $5,180-5,230/mt with the most-liquid SHFE contract at 42,000-42,500 yuan/mt. Spot copper premiums are seen at 140-150 yuan/mt with consumers taking a wait-and-watch stance. 


Zinc: Three-month LME zinc rose to a session high of $1,927/mt and finished the day 1.27% higher at $1,910/mt, as widespread stimulus measures and plans to easing lockdowns boosted market sentiment. LME zinc inventories continued to shrink, by 1700 mt, or 1.71%, to 97,775 mt. The resumption of mining operations and zinc-related consumption will determine near-term prices of the metal. LME zinc is expected to hover between $1,880-1,930/mt with the most-liquid SHFE contract at 15,800-16,300 yuan/mt. 


Nickel: The decision to support commercial stockpiling of metals by Chinese governments lifted market sentiment overnight, but macroeconomic development and fundamentals should be more focused on. Three-month LME nickel followed the movement of its SHFE last night, slipping to an intraday low of $12,170/mt and pared some losses to end at $12,235/mt, down 0.12% on the day. Support from the 60-day moving average will be monitored. 


Lead: Three-month LME lead trimmed some increase as it came off after climbing to a session high of $1,656/mt, bolstered by news that China will encourage stockpiling of key nonferrous metals by firms to prop up the market. LME lead closed 0.77% higher on the day at $1,636.5/mt, with limited upward momentum expected in the near term. 


Tin: Three-month LME tin jumped to as high as $15,500/mt during the Asian trading hours, closing the Monday session $500/mt higher at $15,410/mt. LME tin inventories lost 80 mt on Monday to 5,965 mt. Today, LME tin is expected to face resistance from $15,600/mt, with support expected from $15,000/mt. 

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Oct 02, 2026 16:31 (GMT+8)
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
Oct 02, 2026 16:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Oct 02, 2026 15:31 (GMT+8)
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
Oct 02, 2026 15:31 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Oct 02, 2026 15:27 (GMT+8)
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
Oct 02, 2026 15:27 (GMT+8)