Rejection of Porgera mine lease extension to significantly affect Zijin Mining’s gold production

Published: Apr 26, 2020 18:35 (GMT+8)
Zijin Mining said Sunday that its gold production is expected to be significantly affected by the loss from Porgera mine in Papua New Guinea, as the local government has refused to extend the mining lease.

SHANGHAI, Apr 26 (SMM) – Zijin Mining said Sunday that its gold production is expected to be significantly affected by the loss from the Porgera mine in Papua New Guinea, as the local government has refused to extend the mining lease.

 

The gold mine is located in PNG’s northern highlands region and operated by Barrick Niugini Limited (BNL), a joint venture between Barrick and Zijin Mining. Zijin Mining bought a 50% stake in BNL for $298 million in 2015.

 

PNG Prime Minister James Marape said on Friday that the Special Mining Lease will not be renewed “in the best interests of the state, especially in lieu of the environmental damages, claims and resettlements issues.”

 

BNL applied for the extension of the mining lease in June 2017, in a bid to “ensure that arrangements are in place to enable continued operations of the Porgera Gold Mine once the current SML expires in August 2019,” Barrick said in the statement on Friday.  

 

Porgera contributes to about 10% of the nation’s exports and employs over 3,300 Papua New Guinea nationals, according to a report by mining.com.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
One Bullion completes second Vumba drill hole in Botswana
22 hours ago
One Bullion completes second Vumba drill hole in Botswana
Read More
One Bullion completes second Vumba drill hole in Botswana
One Bullion completes second Vumba drill hole in Botswana
[SMM Gold flash] One Bullion has completed the second hole of its approximately 3,000-metre diamond-drilling programme at the Vumba gold project in northeastern Botswana. VUDD018 reached 350.85 metres at the Central–Makoba target, while drilling had started on the third hole, VUDD019. Preliminary visual logging recorded repeated silica–carbonate alteration, quartz–carbonate veining and arsenopyrite with lesser pyrite. The oblique hole gives the explorer a second structural view of the Central–Makoba system and will contribute to its three-dimensional geological model. No assays from VUDD018 were available, however, and visual alteration, veining and sulphides do not establish gold grade, mineralised width or economic significance. Laboratory results and QA/QC review are therefore required before the target can be assessed.
22 hours ago
Bullion falls 0.9% as weekly decline reaches 3.4%
23 hours ago
Bullion falls 0.9% as weekly decline reaches 3.4%
Read More
Bullion falls 0.9% as weekly decline reaches 3.4%
Bullion falls 0.9% as weekly decline reaches 3.4%
[SMM Precious Metals Flash] Spot gold fell 0.9% to US$4,140.06 an ounce by 18:33 GMT on 2 October and was down about 3.4% for the week, Reuters reported. US gold futures settled 1% lower at US$4,162.30. Bullion reversed an earlier gain of more than 1% despite weaker-than-expected September US payroll growth, as elevated Treasury yields and the dollar’s weekly strength pressured non-yielding metals. The reversal shows that weaker employment data alone was insufficient to overcome pressure from interest-rate expectations and long-dated bond yields. Platinum also fell 2% to US$1,692.90, while palladium declined 0.5% to US$1,165.75, with all major precious metals heading for weekly losses. These figures are Reuters’ stated 2 October market snapshots, not current live quotations.
23 hours ago
Afaq outlines US$146 million Egyptian investment plan
23 hours ago
Afaq outlines US$146 million Egyptian investment plan
Read More
Afaq outlines US$146 million Egyptian investment plan
Afaq outlines US$146 million Egyptian investment plan
[SMM Gold Flash] Afaq Mining has identified a deposit containing about 305,000 ounces of gold at the West Gabal Elba concession in Egypt’s southeastern desert, chairman Mostafa Elbahr told Reuters during the Egypt Mining Forum held on 28–29 September. The privately owned Egyptian company plans to invest about US$146 million over four to five years in further exploration and an initial production facility; the spending and production have not yet occurred. The disclosure adds a prospective source beyond Sukari, which currently dominates Egypt’s modern gold output. It also supports the government’s ambition to lift national production to 800,000 ounces annually by 2030 from roughly 500,000 ounces at Sukari. Reuters did not characterise Afaq’s figure as a mineable reserve or report that its facility had been built; commercial production would still depend on further technical work, permits and financing.
23 hours ago