April 22 Tianjin zinc ingots in stock

Published: Apr 22, 2020 11:51 (GMT+8)

SMM4, 22nd:

The mainstream transaction of zinc ingots in Tianjin market was 15970-17260 yuan / ton, that of ordinary brands was 15970-16090 yuan / ton, and that of the 2005 contract was 270yuan / ton to 350yuan / ton. Compared with Shanghai stock market, Tianjin market decreased from 140yuan / ton to 130yuan / ton. Low shock of zinc in Shanghai today. The spot market increases the discount quotation, the quotation is more unified, the ordinary brand lark newspaper in the 05 contract bid up 280 yuan / ton, the red gold newspaper in the 05 contract rose 350 yuan / ton, Chi Hong reported in the 05 contract rose 270 yuan / ton, the high price brand Zijin to the May contract rose 350 yuan / ton, before noon Zijin rose to 380 yuan / ton. The low price of zinc today fluctuated, driven by a larger increase in the discount rate in the Shanghai market, Tianjin traders raised the discount water delivery, in which Chihong has arrived one after another, the market liquidity has been restored; downstream, the spot price today is flat than yesterday, the willingness to receive goods downstream has not yet seen a significant improvement, still maintain the need to purchase, Zijin take the goods better. On the whole, the transaction today is flat compared with yesterday. The transaction of zinc ingot is near 15920-16040 yuan / ton.

Brand name

Liter water

Chihong

5% 270

Red Ye

5% 350

Lark

5: 280

Purple gold

5% 350

Huludao

5-1520

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
7 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
7 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
11 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
11 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
11 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
11 hours ago