April 21 Tianjin zinc ingots in stock

Published: Apr 21, 2020 11:51 (GMT+8)

SMM4, 21 March:

The mainstream transaction of zinc ingots in Tianjin market was 15980-17280 yuan / ton, and that of ordinary brands was 15980-16120 yuan / ton. The contract for 2005 rose from 250 yuan / ton to 350 yuan / ton. Tianjin market rose from 120 yuan / ton to 140 yuan / ton compared with Shanghai market. Zinc fell sharply in Shanghai today. In the spot market, the discount quotation was upgraded and the quotation was divided. The ordinary brand lark reported a rise of 230 yuan / ton on the 05 contract, and 320 yuan / ton on the 05 contract. Chi Hong reported 250 yuan / ton on the 05 contract, and Zijin, a high-priced brand, reported 350 yuan / ton on the May contract. Today, zinc prices broke down, traders raised discount water delivery, however, due to the downstream for short-term prices to maintain bearish sentiment, the willingness to receive goods is not good, before the close of early trading traders cut discount quotation, each variety has 20-30 yuan / ton downgrade; downstream, after today's price plunge, purchasing willingness has not seen a significant improvement, still maintain the need to purchase, among them Zijin transaction is better. On the whole, the transaction today is flat compared with yesterday. The transaction of zinc ingot is near 15930-16070 yuan / ton.

Brand name

Liter water

Chihong

5x 250

Red Ye

520

Lark

5: 230

Purple gold

5% 350

Huludao

5-1510

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
11 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
11 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
15 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
15 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
15 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
15 hours ago