[brief Review of lead in SMM period] lead Upstream in Shanghai is weak to pay attention to fundamental supply changes

Published: Apr 08, 2020 15:54 (GMT+8)

SMM, 8 April:

Within days, the Shanghai lead main force 2005 contract opened at 13930 yuan / ton, the macro impact receded, Shanghai lead trend returned to its own fundamentals, as the relationship between domestic supply and demand quietly changed, the long profit market stopped earnings, the Shanghai lead center of gravity was weak, and finally closed at 13715 yuan / ton, down 2005 yuan / ton, down 1.15%, positions reduced by 1218 hands to 21715. Shanghai lead closed in the negative line, the continuation of the horizontal market, the 5-day moving average has turned down, and regeneration / primary upside down there are signs of narrowing, the recent fundamentals, pay attention to smelting waste supply changes, technical aspects, pay attention to the shock interval lower limit of 13600 yuan / ton support.

In addition, according to the announcement of the previous issue, there has been no night trading in Shanghai since February 3, and the recovery time has yet to be determined.

(Guo Rong, Shanghai Colored Network Tel: 021-51666879)

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Market caution rises as long holiday approaches; SHFE lead 2611 contract consolidates [Lead Futures Brief Review]
2 hours ago
Market caution rises as long holiday approaches; SHFE lead 2611 contract consolidates [Lead Futures Brief Review]
Read More
Market caution rises as long holiday approaches; SHFE lead 2611 contract consolidates [Lead Futures Brief Review]
Market caution rises as long holiday approaches; SHFE lead 2611 contract consolidates [Lead Futures Brief Review]
2 hours ago
Data: SHFE, DCE market movement (Sep 29)
3 hours ago
Data: SHFE, DCE market movement (Sep 29)
Read More
Data: SHFE, DCE market movement (Sep 29)
Data: SHFE, DCE market movement (Sep 29)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 29 Sep , 2026
3 hours ago
【SMM Flash News】Vox Agrees to Acquire 0.75% NSR Royalty over Sorby Hills Silver-Lead Project for US$13 Million
4 hours ago
【SMM Flash News】Vox Agrees to Acquire 0.75% NSR Royalty over Sorby Hills Silver-Lead Project for US$13 Million
Read More
【SMM Flash News】Vox Agrees to Acquire 0.75% NSR Royalty over Sorby Hills Silver-Lead Project for US$13 Million
【SMM Flash News】Vox Agrees to Acquire 0.75% NSR Royalty over Sorby Hills Silver-Lead Project for US$13 Million
Vox Royalty announced that its Australian subsidiary had entered into a binding agreement to acquire an effective 0.75% net smelter return royalty over the Sorby Hills silver-lead project in Western Australia for US$13 million in cash from a private seller. The transaction has not yet closed and remains subject to customary conditions precedent and approval by Australia's Foreign Investment Review Board, with completion expected in Q4 2026. Sorby Hills is 100%-owned and operated by Boab Metals and is currently under construction. ACCESS Newswire Boab currently targets commissioning and ramp-up in H1 2027, first concentrate production in H2 2027 and full production by Q4 2027. The project is planned to produce approximately 68,000 tonnes of lead and 2.2 million ounces of silver annually over an initial 8.5-year mine life. The Phase IX drilling program completed in September comprised 47 sonic and diamond-core holes totaling approximately 5,880 metres. Resource-to-reserve conversion drilling has been completed across the B, Omega, Norton and Beta deposits, while further drilling is underway at the Keep zinc target.
4 hours ago