SMM4 January 1 Ningbo Zinc Ingot spot: mainstream supply rising and downstream Mining weak

Published: Apr 01, 2020 11:35 (GMT+8)
SMM: Ningbo mainstream transactions in 15340-15420 yuan / ton, ordinary brands on the 2004 contract rose 100-120 yuan / ton, Ningbo compared with Shanghai ordinary brand spread maintained at 40 yuan / ton yesterday.

SMM, April 1-

The mainstream transaction in Ningbo was 15340-15420 yuan / ton, the ordinary brand rose 100-120 yuan / ton to the 2004 contract, and the price difference between Ningbo and Shanghai ordinary brand remained near 40 yuan / ton yesterday. Today, the Ningbo market supply circulation is more abundant, the holder is active to ship the goods, the morning attempt quotation is not unified. In the morning, West Mine, Tiefeng, Hualian and other brands reported an increase of about 120 yuan / ton in the April contract. Huize continued its quotation yesterday near 120 yuan / ton in April, and a small amount of spot Kirin reported 140 yuan / ton in the April contract. The main reason is that the supply of goods is on the high side, and the overall transaction situation is poor. In addition, the Baohui newspaper was near the 100 yuan / ton increase in the April contract. Today, the spot market rose again, the superimposed disk returned to rise, the downstream transaction situation is very weak, it is reported that the current Ningbo market downstream orders situation is poor, the overall transaction is worse than yesterday.

Brand name

Liter water

Kirin

440

West Coal Mine, Tiefeng, Hualian

4x 120

Treasure emblem

4x 100

Huize

4x 120


Scan QR code, apply to join SMM metal communication group, please indicate company + name + main business

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
15 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
15 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
19 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
19 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
19 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
19 hours ago