Tight zinc concentrate supply to expand downside room in TC

Published: Mar 24, 2020 17:17 (GMT+8)
Treatment charges (TCs) for zinc concentrate may face further downside potential on tighter supply as Chinese miners are grappling with losses on falling zinc prices and the coronavirus pandemic has deterred operations of some overseas zinc miners.

SHANGHAI, Mar 24 (SMM) – Treatment charges (TCs) for zinc concentrate may face further downside potential on tight supply as Chinese miners are grappling with losses on falling zinc prices and the coronavirus pandemic has deterred operations of some overseas zinc miners. 


The recent plunges in zinc prices amid intensified panic over the COVID-19 erased profits at Chinese zinc miners. SMM learned that some miners struggled to maintain operations amid losses and some producers planned to delay their resumption. 


But large-scale output cut has not occurred at domestic mines given the existing average profit of 500 yuan/mt at zinc smelters, SMM survey showed. 


In the overseas market, Lundin Mining has suspended the expansion project at its Neves Corvo mine in Portugal, while the company originally targeted an output increase of 27,000 mt in metal content this year. Several mines under Brazil’s Nexa Resources have been put into maintenance due to authorities quarantine order amid the COVID-19 outbreak.


Disrupted mining is expected to weigh on supply and threaten zinc concentrate imports by China. 


According to SMM assessments, the weekly TCs for imported spot zinc concentrate stood at $260/dmt as of March 20, down $10/dmt from a week ago. The weekly TCs for domestic spot zinc concentrate declined 100 yuan/mt week on week to 6,100 yuan/mt, both in metal content, as of March 20. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
2 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
2 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
6 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
6 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
6 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
6 hours ago