SMM Morning Comments (Mar 10): Shanghai base metals rebounded on Tuesday morning

Published: Mar 10, 2020 10:03 (GMT+8)
LME base metals extended their declines for the most part on Monday, with copper leading the losses with a drop of 1.89%. Zinc fell 0.53%, nickel lost 1.83%, lead shed 1.85%, while aluminum gained 0.21% and tin added 0.21%.

SHANGHAI, Mar 10 (SMM) – SHFE nonferrous metals opened higher across the board on Tuesday morning, recovering from the slumps on Monday which were triggered by coronavirus fears and an oil price crash. 


LME base metals extended their declines for the most part on Monday, with copper leading the losses with a drop of 1.89%. Zinc fell 0.53%, nickel lost 1.83%, lead shed 1.85%, while aluminum gained 0.21% and tin added 0.21%. 


US shares went into a steep slide Monday as a combination of COVID-19 concerns and a crash in oil prices spread alarm through the market, resulting in the first automatic halt in trading in over two decades.


Copper: Three-month LME copper declined to the lowest level in more than three years at $5433/mt before it pared some losses and closed down 1.89% lower on the day at $5,524/mt. Gold prices climbed above $1,700/oz as investors flocked to safety amid growing concerns about an oil price war and the deadly coronavirus. Today, LME copper is expected to trade between $5,480-5,540/mt with the most-active SHFE contract at 436,000-44,000 yuan/mt. Spot offers are expected to flip to premium as high as 10 yuan/mt as reduced futures prices attract spot purchases. 


Aluminium: Three-month LME aluminium fell to the lowest level since October 2016 at $1,644/mt, before it regained the losses and closed up 0.21% on the day at $1,694/mt. Trading range is expected at $1650-1710/mt today, with the most-active SHFE contract hovering between 12,750-13,050 yuan/mt. 


Zinc: Three-month LME zinc trimmed losses after slipped to a session low of $1,913/mt as short-covering lifted it to a high of $1,991.5/mt and settled it 0.53% lower on the day at $1,977.5/mt. LME zinc inventories shrank 100 mt, or 0.13% on Monday to 74,300 mt. Operating rates across zinc downstream processors in China are expected to climb further this week, and the support to new orders will be closely monitored. LME zinc is seen trading between $1,950-2,000/mt today with the most-traded SHFE contract at 15,400-15,900 yuan/mt. 


Nickel: Three-month LME nickel lost support from the Bollinger middle band and dipped to an intraday low of $12,300/mt after a slump in crude oil prices dampened market sentiment. It regained some declines and finished the day 1.83% lower at $12,600/mt. SMM expects LME nickel to test the $12,600/mt level today. 


Lead: Three-month LME lead extended its declines and ended down 1.85% on the day at $1,805/mt with an intraday low of $1,799/mt. Support from $1800/mt will be monitored today. 


Tin: Three-month LME tin recovered early losses as it bounced back from a session low of $16,440/mt and closed at $16,795/mt, up $35/mt on the day. It received support from the 20-day moving average. Today, pressure above is seen from $16,900/mt. 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
1 hour ago
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
Read More
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
SHFE: Approves Jinchuan Group Co., Ltd. to increase the registered production site for “JNMC” brand Grade A copper (permanent cathode-K)
1 hour ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
2 hours ago
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
Read More
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
[SMM Announcement] Chinese Market Metal Prices and News Updates Suspended during National Day Holiday (Oct 1-7)
2 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
2 hours ago
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Read More
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper Completes Haib PFS Drilling, Targets Updated Resource and PFS by Year-End
Koryx Copper has completed its infill and expansion drilling programme at the wholly owned Haib Copper Project in southern Namibia, advancing the project toward an updated Mineral Resource Estimate (MRE) and Pre-Feasibility Study (PFS) targeted for publication before the end of 2026.​ The company reported assay results from a further 18 drill holes totalling 7,074 metres. Among the latest results, hole HM199 returned 438 metres grading 0.40% copper equivalent (CuEq), including 224 metres at 0.51% CuEq. Hole HM193 returned 681 metres at 0.34% CuEq, including 22 metres at 0.71% CuEq and 169 metres at 0.40% CuEq.​ Koryx said the results continued to demonstrate wide mineralised intercepts across the Haib deposit, together with higher-grade zones closer to surface in some areas. The company said the results broadly correlate with its existing geological model, while the completed drilling programme will feed into geological modelling and estimation work for the updated resource estimate and PFS.​ Haib is a large disseminated porphyry copper-molybdenum-gold deposit. Koryx currently envisages developing the project as a large-scale open-pit operation using conventional sulphide milling and flotation to produce copper and molybdenum concentrates.​ The latest drilling follows Koryx's March 2026 Mineral Resource Estimate, which reported 744 million mt of Indicated material grading 0.28% copper, containing approximately 2.09 million mt of copper, and 579 million mt of Inferred material grading 0.24% copper, containing approximately 1.39 million mt of copper, using a 0.15% copper cut-off. Koryx said the updated MRE and PFS remain on track for publication before the end of 2026.​ Completion of the PFS drilling programme marks another step in Koryx Copper's advancement of Haib toward a potential large-scale copper development. The latest drilling continues to show broad mineralised intervals, while the upcoming updated resource estimate will provide greater clarity on whether recent infill and expansion drilling has materially changed the project's resource base. Attention will now turn to the updated MRE and PFS expected before year-end, which should provide further detail on the proposed mine configuration, processing strategy, production profile and project economics.
2 hours ago
SMM Morning Comments (Mar 10): Shanghai base metals rebounded on Tuesday morning - Shanghai Metals Market (SMM)