Rebar supply to rise in mid-March with steel rolling mills in east China ramping up production

Published: Mar 05, 2020 10:43 (GMT+8)
Steel rolling mills in east China will continue to step up production and suspended electric arc furnace (EAF) steelmakers mull resumption in the middle of the month

SHANGHAI, Mar 5 (SMM) – Supply of construction steel rebar is expected to pick up around mid-March after weeks of declining amid maintenance and production cut at producers on the coronavirus impact, as steel rolling mills in east China continue to step up production and suspended electric arc furnace (EAF) steelmakers mull resumption in the middle of the month. 


Like EAF steel plants, steel rolling mills also grappled with inventory and cash flow pressure resulted by the slow post-holiday recovery of downstream demand, but greater availability of raw materials steel billet, compared with steel scrap, and more flexible production operations narrowed the losses facing steel rolling mills. 


A slew of steel rolling mills in east China reported slight profits and one mill had restarted operations as early as February 11, with current operating rates ramping up to 100%, SMM learned. Another steel rolling plant in east China kept half of its capacity in operation after reopened in mid-February, and planned to hike the operating rates to 80% next week. 


Steel rolling mills in other regions such as south China planned to resume production in mid-March. 


SMM data showed that the operating rates across EAF steel plants in China stood at 7.58% as of March 3. About 40.7% of the suspended producers planned to resume operations in mid-March, but raw materials shortage and limited profits may constrain their production to less than half of the normal levels.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Sep 28, 2026 17:34 (GMT+8)
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Read More
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
Heyuan Issues Strict Regulations and Fines for Unauthorized Waste Lead-Acid Battery Management
[Waste Lead-Acid Battery Market Update] Recently, the Heyuan Municipal Ecology and Environment Bureau issued the "Notice on Regulating the Management of Waste Lead-Acid Batteries." According to the Ecological Environment Code of the People's Republic of China, enterprises and public institutions that engage in the collection and storage of waste without a permit may be fined 200,000-1 million yuan; those that engage in utilization and disposal operations without a permit may be fined 1-5 million yuan and ordered to suspend operations or shut down, with responsible persons fined 100,000-1 million yuan; if the act constitutes a crime, criminal liability shall be pursued in accordance with the law.
Sep 28, 2026 17:34 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Sep 28, 2026 17:33 (GMT+8)
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
Read More
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
"Guangzhou Tightens E-bike Waste Lead-Acid Battery Management, Clarifies Hazardous Waste Rules"
[Market Dynamics of Waste Lead-Acid Batteries from E-bikes] Recently, the Guangzhou Municipal Ecology and Environment Bureau issued a notice on the key points for environmental management of waste lead-acid batteries from e-bikes in Guangzhou. The document clarifies that waste lead-acid batteries are hazardous waste (HW31, 900-52), and scrap batteries generated from store recycling, trade-in, and repair must be transferred to licensed units. Units holding a hazardous waste collection permit (including 900-52) are exempt from electronic transfer manifests during the collection process under the centralized collection pilot program.
Sep 28, 2026 17:33 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Sep 26, 2026 01:38 (GMT+8)
Peru sees 1 million t/y copper output boost within five to six years
Read More
Peru sees 1 million t/y copper output boost within five to six years
Peru sees 1 million t/y copper output boost within five to six years
Peru's Energy and Mines Minister Guillermo Shinno said the country expects to add about 1 million tonnes of annual copper production within five to six years through new mining projects. The world's third-largest copper producer anticipates 2026 output of 2.5 to 2.7 million tonnes, roughly unchanged from 2023 as declining ore grades and recurring social conflicts weigh on supply. The newly elected government is seeking to reverse that stagnation by cutting red tape; in the two months since taking office, mining companies have stepped up engagement with the ministry. Shinno said officials have identified 27 permits that could be eliminated from roughly 100 mining-sector requirements, without lowering environmenta
Sep 26, 2026 01:38 (GMT+8)